Retrieving RFP details
Release
Close
Town of Westborough
The Project includes pump and channel grinder replacement, wet well access modifications and improvements, generator replacement, window replacement, installation of new bathroom(s) and associated electrical and instrumentation rehabilitation; and all materials.
Town of Westborough
Project includes pump and channel grinder replacement, wet well access modifications and improvements, generator replacement (Maynard Pump Station only), window replacement, installation of new bathroom(s) and associated electrical and instrumentation rehabilitation; and all materials, equipment, services and construction inherent to the Work.
City of Eagle Point
Construction of highway 62 pump station upgrades. Work to be performed includes pump station retrofit, miscellaneous site work, and flow control valve installation.
Wyoming Valley Sanitary Authority
The purpose of this project is to replace all existing pumps, valves and associated piping, as well as remove and install a stainless steel floor and to strip and paint the interior of the dry well at Pump Station-4S (PS-4S). The existing pumps are obsolete. The upgrades will be done inside the dry well of the pump station which is an underground steel can type structure that is accessed by a single vertical ladder. The dry well is approx. 96” dia. x 96” tall and the ground level to the dry well floor is approx. 20'-0”. WVSA will provide the new pumps ONLY. The Contractor will provide all new fabrications, piping components, valves, gaskets, hardware, pipe supports, paint, paint supplies, tools, equipment and labor etc. to complete the scope of the project per WVSA supplied drawings and specs.
Release
Sep 24, 2025
Close
Nov 12, 2025