Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Charles County
Charles County Government is soliciting proposals from qualified engineering firms to provide professional engineering services to design and upgrade the headworks at the Mattawoman Wastewater Treatment Plant. The scope includes design and upgrade work, and small, local, and minority business enterprises are encouraged to respond.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Taos
The Town of Taos (via the New Mexico SPD) posted a sole source procurement to purchase a replacement submersible grit pump for the Headworks/MBR system at the wastewater treatment plant. The notice lists a start date of 2025β11β04 and a due date of 2025β12β05, with an amount of $54,190.35.
Posted Date
Nov 4, 2025
Due Date
Dec 5, 2025
Release: Nov 4, 2025
Town of Taos
Close: Dec 5, 2025
The Town of Taos (via the New Mexico SPD) posted a sole source procurement to purchase a replacement submersible grit pump for the Headworks/MBR system at the wastewater treatment plant. The notice lists a start date of 2025β11β04 and a due date of 2025β12β05, with an amount of $54,190.35.
AvailableCity of Wyoming
The Work of this Contract is generally described as replacement of the existing screenings and grit systems with new multi-rake screens with washing/compaction for screening handling, and grit classifiers and pumps. The work includes new process piping and equipment, structural, plumbing, electrical, and instrumentation and control components.
Posted Date
Oct 21, 2025
Due Date
Nov 25, 2025
Release: Oct 21, 2025
City of Wyoming
Close: Nov 25, 2025
The Work of this Contract is generally described as replacement of the existing screenings and grit systems with new multi-rake screens with washing/compaction for screening handling, and grit classifiers and pumps. The work includes new process piping and equipment, structural, plumbing, electrical, and instrumentation and control components.
AvailableTown of Alma
The Project includes the following Work: Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building (pre-engineered metal building), secondary treatment process and associated concrete basins, aeration system, blowers, lift station, UV disinfection system, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal.
Posted Date
Oct 31, 2025
Due Date
Dec 19, 2025
Release: Oct 31, 2025
Town of Alma
Close: Dec 19, 2025
The Project includes the following Work: Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building (pre-engineered metal building), secondary treatment process and associated concrete basins, aeration system, blowers, lift station, UV disinfection system, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal.
AvailableRobesonia-Wernersville Municipal (Sewer) Authority
Wastewater treatment plant upgrade: removal and replacement of two RBC Treatment Trains including the RBC shafts, bearings, bearing mounts, motors, installation of media, removal and disposal of existing media, aeration diffusers, concrete repairs and coating of tanks. The contract also includes the replacement of three Raw Sewage Influent Pumps, replacement of three (3) influent check valves, replacement of the influent fine screen and removal of the existing influent screen, replacement of six (6) Philadelphia Mixers and the removal and replacement of the weir trough and scum baffle in Digesters No. 1 and No. 2 and replacing the Center Manifold and Suction & Plow Arm in Digester No.1 and repairs and coating of the two digesters.
Posted Date
Oct 17, 2025
Due Date
Dec 9, 2025
Release: Oct 17, 2025
Robesonia-Wernersville Municipal (Sewer) Authority
Close: Dec 9, 2025
Wastewater treatment plant upgrade: removal and replacement of two RBC Treatment Trains including the RBC shafts, bearings, bearing mounts, motors, installation of media, removal and disposal of existing media, aeration diffusers, concrete repairs and coating of tanks. The contract also includes the replacement of three Raw Sewage Influent Pumps, replacement of three (3) influent check valves, replacement of the influent fine screen and removal of the existing influent screen, replacement of six (6) Philadelphia Mixers and the removal and replacement of the weir trough and scum baffle in Digesters No. 1 and No. 2 and replacing the Center Manifold and Suction & Plow Arm in Digester No.1 and repairs and coating of the two digesters.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis