Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include demo existing dugout and slab to include a portion of the sidewalk. The new dugouts will be positioned to align with the existing r-panel fence. The new dugouts are to be 14' x 46' on the new home side which is the south east side. The visitor s side is to be 14' by 40' on the north west side. The heights of the dugouts should be 7' at the rear, and 8' at the front. There is to be a guard rail with a net in front of each dugout to protect players. It should be about 48" tall with black netting stretched inside, and padding around the pipe top and side posts.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal and replacement of existing backstop, and players benches.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Removal and replacement of existing backstop, and players benches.
Available1. Pre-Construction a. Verify sign locations (in field) b. Survey c. Subsurface utility coordination d. Develop production drawings e. Submittal of all production materials for Henry County approval 2. Permitting & Reviews a. Georgia Department of Transportation approval of stamped production drawings b. Georgia Department of Transportation permit of signage locations 3. Sign Fabrication 4. Construction & Installation a. Demolition and disposal of existing signage b. Use of durable, breakaway, weather-resistant materials c. Installation of new footings and signage d. Compliance.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
1. Pre-Construction a. Verify sign locations (in field) b. Survey c. Subsurface utility coordination d. Develop production drawings e. Submittal of all production materials for Henry County approval 2. Permitting & Reviews a. Georgia Department of Transportation approval of stamped production drawings b. Georgia Department of Transportation permit of signage locations 3. Sign Fabrication 4. Construction & Installation a. Demolition and disposal of existing signage b. Use of durable, breakaway, weather-resistant materials c. Installation of new footings and signage d. Compliance.
Available1. Pre-Construction a. Verify sign locations (in field) b. Survey c. Subsurface utility coordination d. Develop production drawings e. Submittal of all production materials for Henry County approval 2. Permitting & Reviews a. Georgia Department of Transportation approval of stamped production drawings b. Georgia Department of Transportation permit of signage locations 3. Sign Fabrication 4. Construction & Installation a. Demolition and disposal of existing signage b. Use of durable, breakaway, weather-resistant materials c. Installation of new footings and signage d. Compliance.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
1. Pre-Construction a. Verify sign locations (in field) b. Survey c. Subsurface utility coordination d. Develop production drawings e. Submittal of all production materials for Henry County approval 2. Permitting & Reviews a. Georgia Department of Transportation approval of stamped production drawings b. Georgia Department of Transportation permit of signage locations 3. Sign Fabrication 4. Construction & Installation a. Demolition and disposal of existing signage b. Use of durable, breakaway, weather-resistant materials c. Installation of new footings and signage d. Compliance.
Provide fencing materials and installation services.
Posted Date
Nov 24, 2025
Due Date
Dec 15, 2025
Release: Nov 24, 2025
Close: Dec 15, 2025
Provide fencing materials and installation services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis