Retrieving RFP details
Release
Close
Town of Washtucna
Drill, construct and test a new approx 1,200' deep groundwater production well. The new well is expected to be permanently cased with 16" steel casing, sealed to a depth of approx. 825'. The well must be drilled as a 15" open borehole below the permanent casing. The owner may elect to complete the new well with a 12.75" liner with screened intervals. The desired min. capacity is 500 gpm. Direct air-rotary or flooded reverse-circulation drilling methods are required for drilling operations.
City of Gloucester City
Replacement Well No. 44.
Kent County
Replace and abandon existing Well #2 by constructing a new well adjacent to it, to be named Well #4. Work also includes a new well pump, minor site work, minor pipe work, a replacement motor starter, and electrical work associated with the new well pump.
Town of Texhoma
Replacement of water well pipe and pump. The pipe should be 3" sch 80 pipe and a total of 399'. The pump needs to be a 20 HP pump with motor and shroud that will pump at a rate of 150-175 GPM. We would like to send a camera down hole to look at the well casing and at the perforations. The well currently is 433' total depth and static water level is 271'.
Release
Oct 24, 2025
Close
Nov 21, 2025