Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include approx 1,400 SF single-story clinic addition at the southwest corner of the existing building. Renovations within the existing building. Associated sitework, utilities, landscaping, and parking modifications. Two parking spaces removed/converted for new construction. Additional work required for interior signage and security/cctv under owner allowances. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This opportunity requests WBE and SDVOB participation for the TAB 25-15 D215036 Safety Improvements project; McLaughlin Construction Corp. (dba Edbauer Construction) was listed as the low bidder and is seeking additional WBE/SDVOB subcontractor participation. Work is scheduled to start April 2026 and complete by 2026-11-20; plans and specs can be requested from the contact or downloaded from the NYSTA contractor documents site. Contracting goals are listed: SDVOB 2%, MBE 10%, WBE 10%.
Posted Date
Nov 21, 2025
Due Date
Dec 31, 2025
Release: Nov 21, 2025
Close: Dec 31, 2025
Premium
Access the largest public sector contact database
This opportunity requests WBE and SDVOB participation for the TAB 25-15 D215036 Safety Improvements project; McLaughlin Construction Corp. (dba Edbauer Construction) was listed as the low bidder and is seeking additional WBE/SDVOB subcontractor participation. Work is scheduled to start April 2026 and complete by 2026-11-20; plans and specs can be requested from the contact or downloaded from the NYSTA contractor documents site. Contracting goals are listed: SDVOB 2%, MBE 10%, WBE 10%.
Project consists of demolition of existing aeration system, installation of new fine bubble diffuser system, and installation of process piping, valves &pumps. See outside link.
Posted Date
Nov 24, 2025
Due Date
Dec 31, 2025
Release: Nov 24, 2025
Close: Dec 31, 2025
Project consists of demolition of existing aeration system, installation of new fine bubble diffuser system, and installation of process piping, valves &pumps. See outside link.
AvailableW.M. Schultz Construction, Inc., bidding as prime contractor, is soliciting quotes from qualified subcontractors, suppliers, and trucking firms for the Village of Monticello Water System Improvements – Phase 1, Contract No. 4G (General Construction). The work includes constructing a new raw water intake and pumping facilities, chemical storage and feed systems, finished water pumping, a clear well, and a new SCADA system; bids will be submitted on unit price and lump-sum bases. Contractors must comply with applicable federal requirements including the Build America, Buy America Act and provide NYSDOL registration as required by Labor Law Section 220-I.
Posted Date
Nov 27, 2025
Due Date
Jan 8, 2026
Release: Nov 27, 2025
Close: Jan 8, 2026
W.M. Schultz Construction, Inc., bidding as prime contractor, is soliciting quotes from qualified subcontractors, suppliers, and trucking firms for the Village of Monticello Water System Improvements – Phase 1, Contract No. 4G (General Construction). The work includes constructing a new raw water intake and pumping facilities, chemical storage and feed systems, finished water pumping, a clear well, and a new SCADA system; bids will be submitted on unit price and lump-sum bases. Contractors must comply with applicable federal requirements including the Build America, Buy America Act and provide NYSDOL registration as required by Labor Law Section 220-I.
AvailableWork include mobilize utilizing barge in the black rock canal and install turbidty curtain remove debris under the structure replace slope protection around abutment perform timber fender system repairs install pile and floating debris boom perform steel sheet pile wall repairs install chain link fence clean up.
Posted Date
Dec 18, 2025
Due Date
Jan 30, 2026
Release: Dec 18, 2025
Close: Jan 30, 2026
Work include mobilize utilizing barge in the black rock canal and install turbidty curtain remove debris under the structure replace slope protection around abutment perform timber fender system repairs install pile and floating debris boom perform steel sheet pile wall repairs install chain link fence clean up.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis