Retrieving RFP details
Release
Close
East Hardwick Neighborhood Organization, Inc.
A pre-built pavilion. The pavilion should be approx. 10' x 20' and open on four sides, and building components should consist of cedar or other natural, rot-resistant wood. The roof material can be shingle (asphalt or wood) or metal.
request-for-price-quotes
pavilion
City of Cromwell
Work generally includes selective demolition, HVAC upgrades and an interior renovation to the existing community pavilion.
City of Neosho
Work includes of demolition, clearing and disposal of debris of old restroom building, and build a new pavilion and restroom. Site preparation; demolition of building; pour a concrete slab, build a pavilion and one ada compliant unisex restroom under pavilion; electrical lighting and receptacles; guttering; connect utilities - sewer and water; stub-out electrical 5 feet from new pavilion; connect sidewalk to pavilion; clean up and site restoration. Demolition will be clearing and removal of debris of the old restrooms. Concrete slab will be approximately 24 feet wide x 40 feet long with 4-inch thickness with 2'x2' footings. Concrete slab will run east to west. See outside link.
City of Wheeling
Robrecht trailhead project phase 1 - earthwork and planting.
Release
Oct 23, 2025
Close
Oct 31, 2025