Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Montgomery
Furnish and construct lift station as shown on the plans including but not limited to: excavation & disposal, groundwater control system, wet well, wet well foundation, valve pad, piping, surface preparation and protective coating of wet well interior surfaces & lift station piping, equipment, testing, startup, materials, labor, supervision, and all appurtenances, complete in place. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Brighton
Perform owner's advisor services for the lift station and force main progressive.
Posted Date
Oct 22, 2025
Due Date
Dec 6, 2025
Release: Oct 22, 2025
City of Brighton
Close: Dec 6, 2025
Perform owner's advisor services for the lift station and force main progressive.
AvailableVillage of Justice
Reconstruction of 2,175 ft of pavement, storm sewer, water main, storm water force main, lift station, sidewalk improvements and appurtenent work.
Posted Date
Oct 30, 2025
Due Date
Nov 21, 2025
Release: Oct 30, 2025
Village of Justice
Close: Nov 21, 2025
Reconstruction of 2,175 ft of pavement, storm sewer, water main, storm water force main, lift station, sidewalk improvements and appurtenent work.
AvailableGalveston County Wcid 1
This project consists of the trenchless installation of approx. 1,625 LF of 12" PVC C900 DR18 sanitary force main. The proposed 12" sanitary force main will replace an existing 8" sanitary force main which is to be abandoned as a part of this project. Connections of the proposed 12" sanitary force main will be made at two points in the existing sanitary collection system. See attached files.
Posted Date
-
Due Date
Nov 20, 2025
Galveston County Wcid 1
Close: Nov 20, 2025
This project consists of the trenchless installation of approx. 1,625 LF of 12" PVC C900 DR18 sanitary force main. The proposed 12" sanitary force main will replace an existing 8" sanitary force main which is to be abandoned as a part of this project. Connections of the proposed 12" sanitary force main will be made at two points in the existing sanitary collection system. See attached files.
AvailableCity of Greeley
DESIGN/BUILD: interceptor, lift station, and force main.
Posted Date
Nov 10, 2025
Due Date
Dec 11, 2025
Release: Nov 10, 2025
City of Greeley
Close: Dec 11, 2025
DESIGN/BUILD: interceptor, lift station, and force main.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis