Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS temporary bypass pumping; 1 LS lift station and appurtenances; 1 LS emergency generator and fuel tank; 1 LS emergency generator ats; 1 LS emergency generator concrete slab; 1 LS 6" stainless steel pipe, and fittings; 1 LS 6" ductile iron pipe and fittings; 4 EA 6" plug valve; 2 EA 6" check valve; 59 LF 10" pvc gravity sewer; 60 LF 6" pvc force main; 1 LS 6" force main fittings and valves; 1 EA water service; 1 LS conversion of existing wetwell to manhole; 1 LS earthwork - excavation and fill; 1 LS retaining wall; 81 SY concrete pavement. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Work include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
Close: Dec 18, 2025
Work include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
AvailableWork includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Work includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
AvailableThe project generally consists of, but is not necessarily limited to, the following major items: construction of new lift station and decommissioning of existing lift station utilizing owner furnished pumps and piping appurtenances.
Posted Date
Dec 2, 2025
Due Date
Dec 19, 2025
Release: Dec 2, 2025
Close: Dec 19, 2025
The project generally consists of, but is not necessarily limited to, the following major items: construction of new lift station and decommissioning of existing lift station utilizing owner furnished pumps and piping appurtenances.
AvailableProcurement of construction services for the City of Adel's Lift Station #18 Improvements, involving the installation of a new wetwell, three submersible pumps, and related infrastructure.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Procurement of construction services for the City of Adel's Lift Station #18 Improvements, involving the installation of a new wetwell, three submersible pumps, and related infrastructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis