Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Lexington
Road infrastructure project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Keene
The City of Keene seeks bids for a multi‑year Downtown Infrastructure Improvements and Reconstruction Project along Main Street and Central Square, including extensive stormwater, water, and sewer replacements; sidewalks, curbs, signals, lighting, and landscaping. The work is divided into two phases targeted for completion in the 2026 and 2027 construction seasons, with responses due December 18, 2025.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
City of Keene
Close: Dec 18, 2025
The City of Keene seeks bids for a multi‑year Downtown Infrastructure Improvements and Reconstruction Project along Main Street and Central Square, including extensive stormwater, water, and sewer replacements; sidewalks, curbs, signals, lighting, and landscaping. The work is divided into two phases targeted for completion in the 2026 and 2027 construction seasons, with responses due December 18, 2025.
AvailableSarpy County Sid 301
Project consists of the hauling and placement of fill material, furnishing, hauling, and placing of rip rap material, and other miscellaneous improvements along the existing district infrastructure protection berms.
Posted Date
-
Due Date
Dec 10, 2025
Sarpy County Sid 301
Close: Dec 10, 2025
Project consists of the hauling and placement of fill material, furnishing, hauling, and placing of rip rap material, and other miscellaneous improvements along the existing district infrastructure protection berms.
AvailableSan Francisco Unified School District
The Project is generally described as including but not limited to: Green Infrastructure Project encompassing the removal of asphalt. Stormwater capture systems. Introduction of native vegetation.
Posted Date
Nov 5, 2025
Due Date
Dec 12, 2025
Release: Nov 5, 2025
San Francisco Unified School District
Close: Dec 12, 2025
The Project is generally described as including but not limited to: Green Infrastructure Project encompassing the removal of asphalt. Stormwater capture systems. Introduction of native vegetation.
AvailableHolmes County
This project consists of the construction of public infrastructure improvements. Improvements consist of the addition of a new paved roadway extension of Drive approx. 1,700 FT west of SR 79, stormwater ponds, filling of existing ponds, the addition of turn lanes on SR 79, the addition of a signalized intersection, new sewer lift station, a 8" water main extension, and an 8" gravity sewer extension along the new roadway. This project also includes clearing and grubbing, earth moving, roadway base work, concrete curb and gutters, concrete pavement, roundabout construction, signing and pavement markings.
Posted Date
Oct 15, 2025
Due Date
Dec 18, 2025
Release: Oct 15, 2025
Holmes County
Close: Dec 18, 2025
This project consists of the construction of public infrastructure improvements. Improvements consist of the addition of a new paved roadway extension of Drive approx. 1,700 FT west of SR 79, stormwater ponds, filling of existing ponds, the addition of turn lanes on SR 79, the addition of a signalized intersection, new sewer lift station, a 8" water main extension, and an 8" gravity sewer extension along the new roadway. This project also includes clearing and grubbing, earth moving, roadway base work, concrete curb and gutters, concrete pavement, roundabout construction, signing and pavement markings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis