Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Letcher County
Seeking proposals from qualifed stream restoration design firms interested in providing services for a watershed-scale floodplain and stream restoration flood risk reduction project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Tri-State Steelheaders
Stream restoration work near College Place includes stream dewatering, concrete work to improve an existing fishway, import and placement of rock to improve the stream channel, and grading of stream banks.
Posted Date
Nov 4, 2025
Due Date
Dec 5, 2025
Release: Nov 4, 2025
Tri-State Steelheaders
Close: Dec 5, 2025
Stream restoration work near College Place includes stream dewatering, concrete work to improve an existing fishway, import and placement of rock to improve the stream channel, and grading of stream banks.
AvailableCalvert County
Project includes stabilizing the existing down-cutting stream using a threshold channel design with step-pools, and utility protection. The channel design includes bed and bank stabilization. Work includes 100 CY class 5 excavation; 5 CY removal of existing masonry; 330 LF diversion fence; 60 SY class i riprap for slope and channel protection.
Posted Date
Oct 16, 2025
Due Date
Nov 20, 2025
Release: Oct 16, 2025
Calvert County
Close: Nov 20, 2025
Project includes stabilizing the existing down-cutting stream using a threshold channel design with step-pools, and utility protection. The channel design includes bed and bank stabilization. Work includes 100 CY class 5 excavation; 5 CY removal of existing masonry; 330 LF diversion fence; 60 SY class i riprap for slope and channel protection.
AvailableBrandywine Red Clay Alliance
Work includes streambank grading and stabilization, in-stream structures, and erosion and sediment control measures.
Posted Date
Oct 17, 2025
Due Date
Nov 21, 2025
Release: Oct 17, 2025
Brandywine Red Clay Alliance
Close: Nov 21, 2025
Work includes streambank grading and stabilization, in-stream structures, and erosion and sediment control measures.
AvailableCity of Charlotte
Charlotte Water (City of Charlotte) requests Statements of Qualifications from engineering firms to provide professional services for stream bank repairs and protection of wastewater infrastructure, including stabilization, restoration, and main repair/relocation. Submissions are due via the Bonfire portal by November 20, 2025 at 2:00 PM EST.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
City of Charlotte
Close: Nov 20, 2025
Charlotte Water (City of Charlotte) requests Statements of Qualifications from engineering firms to provide professional services for stream bank repairs and protection of wastewater infrastructure, including stabilization, restoration, and main repair/relocation. Submissions are due via the Bonfire portal by November 20, 2025 at 2:00 PM EST.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis