Harris County Municipal Utility District 70
Furnishing of all material, equipment, labor and supervision necessary or incidental to “Construction of Wastewater Treatment Plant Phase 2 - 0.750 MGD (Facility Only). Furnish and install a 0.540 MGD prepackaged steel basin wastewater treatment plant (Site work done under a separate contract). Work to include but not limited to supply of prefabricated WWTP Facility including headworks structure, aeration chambers, clarification unit, disinfection basin, sludge aerobic digester unit (dual stage), air distribution system, dechlorination system and building, walkways, and stairs.
City of China
Construction of the new 0.5 MGD wastewater treatment plant. Phase 1 of this project shall provide for the modifications and reduction of the existing wet weather equalization pond, allowing real estate for the construction of the new WWTP process units. Additionally, Phase 1 shall provide for the construction of the two (2) 0.25 MGD sequencing batch reactor treatment train units, composed of four (4) SBR basins, two (2) post-equalization basins, and two (2) digester basins, as well as the new concrete chlorine contact basin. Phase 1 shall also provide for the elevated influent headworks steel structure and walkways around both SBR Trains. Finally, Phase 1 shall provide for the equipment installation of SBR Train 1 in accordance with the manufacturer’s instructions. Additional items included in Phase 1 are a new on-site lift station, miscellaneous piping, and associated manholes. Phase 2 of this project shall provide for the construction of a new electrical building, installation of a new emergency power backup generator, and construction of a new chlorine building. Additionally, Phase 2 shall provide for the equipment installation of SBR Train 2 in accordance with the manufacturer’s instructions. Phase 2 shall also provide for the installation of a new headworks microstrainer, installation of blowers, the construction of new electrical wiring, conduit, and related electrical controls, as well as all piping between units to perform a complete start-up of the new WWTP. After and only after the new WWTP comes online, Phase 2 shall provide for the decommissioning of the existing WWTP. Included as Additive Alternate Bid 1 is the installation of a new Screw Press with necessary appurtenances for a complete installation. Included as an Additive Alternate Bid 2 is the demolition of the existing WWTP. Finally, included as an Additive Alternate Bid 3 is the installation of new concrete pavement.
Harris County Mud 495
Wastewater Treatment Plant No. 1 Phase 5 (1.50 MGD).
City of Waycross
Wastewater Treatment Facility Upgrades – Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
Release
Oct 16, 2025
Close
Nov 11, 2025