Retrieving RFP details
Release
Close
City of Laurinburg
The project consists of constructing electrical improvements including replacement of the generator and fuel tank, electrical feeders, electrical panels, and motor starters.
C_111_Advertisement
City of Warr Acres
Work consist of installation of 2765 LF of 4” PVC waterline by trenching. See outside link.
Sikeston R-6 School District
Provide renovations and improvements to the career and technology center. Bid packages include demolition, concrete, masonry, sheet metal, painting, flooring, doors, frames, hardware, pre-engineered metal building restoration, casework, fire suppression, plumbing, mechanical, electrical line and low voltage, paving, and other work as may be required.
City of China
Construction of the new 0.5 MGD wastewater treatment plant. Phase 1 of this project shall provide for the modifications and reduction of the existing wet weather equalization pond, allowing real estate for the construction of the new WWTP process units. Additionally, Phase 1 shall provide for the construction of the two (2) 0.25 MGD sequencing batch reactor treatment train units, composed of four (4) SBR basins, two (2) post-equalization basins, and two (2) digester basins, as well as the new concrete chlorine contact basin. Phase 1 shall also provide for the elevated influent headworks steel structure and walkways around both SBR Trains. Finally, Phase 1 shall provide for the equipment installation of SBR Train 1 in accordance with the manufacturer’s instructions. Additional items included in Phase 1 are a new on-site lift station, miscellaneous piping, and associated manholes. Phase 2 of this project shall provide for the construction of a new electrical building, installation of a new emergency power backup generator, and construction of a new chlorine building. Additionally, Phase 2 shall provide for the equipment installation of SBR Train 2 in accordance with the manufacturer’s instructions. Phase 2 shall also provide for the installation of a new headworks microstrainer, installation of blowers, the construction of new electrical wiring, conduit, and related electrical controls, as well as all piping between units to perform a complete start-up of the new WWTP. After and only after the new WWTP comes online, Phase 2 shall provide for the decommissioning of the existing WWTP. Included as Additive Alternate Bid 1 is the installation of a new Screw Press with necessary appurtenances for a complete installation. Included as an Additive Alternate Bid 2 is the demolition of the existing WWTP. Finally, included as an Additive Alternate Bid 3 is the installation of new concrete pavement.
Release
Oct 22, 2025
Close
Nov 20, 2025