Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Northern Calif Power Agency
Renovation of the LEC ST Control Oil Skid Fire System and ST Fire Protection Piping Seismic Separation.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Petaluma
The project includes, but is not limited to, structural, architectural, and building systems upgrades to the existing two-story, approx. 10,034 SF historic fire station. Building system upgrades include, but are not limited to, replacement of HVAC, plumbing, and electrical systems; installation of new fire alarm and automatic fire sprinkler systems; and integration of low-voltage and communications infrastructure. Interior improvements include, but are not limited to, voluntary and mandatory seismic upgrades, such as foundations, steel moment frames, shear walls, and apparatus bay concrete floor slab replacement; first- and second-floor restroom renovations to provide gender-neutral facilities; first-floor ADA access upgrades; first-floor kitchen renovation; second-floor sleeping quarters renovation; creation of a dedicated decontamination area and turnout gear storage; construction of a dedicated exercise and fitness room; and installation of automatic fire sprinkler and alarm systems. Exterior restoration includes, but is not limited to, replacement of the existing apparatus bay concrete apron, apparatus bay doors, and exterior windows.
Posted Date
Oct 31, 2025
Due Date
Dec 11, 2025
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Release: Oct 31, 2025
City of Petaluma
Close: Dec 11, 2025
The project includes, but is not limited to, structural, architectural, and building systems upgrades to the existing two-story, approx. 10,034 SF historic fire station. Building system upgrades include, but are not limited to, replacement of HVAC, plumbing, and electrical systems; installation of new fire alarm and automatic fire sprinkler systems; and integration of low-voltage and communications infrastructure. Interior improvements include, but are not limited to, voluntary and mandatory seismic upgrades, such as foundations, steel moment frames, shear walls, and apparatus bay concrete floor slab replacement; first- and second-floor restroom renovations to provide gender-neutral facilities; first-floor ADA access upgrades; first-floor kitchen renovation; second-floor sleeping quarters renovation; creation of a dedicated decontamination area and turnout gear storage; construction of a dedicated exercise and fitness room; and installation of automatic fire sprinkler and alarm systems. Exterior restoration includes, but is not limited to, replacement of the existing apparatus bay concrete apron, apparatus bay doors, and exterior windows.
AvailableHawaii Department of Transportation
Provide construction support (cs) services for interstate route h-1, seismic retrofit.
Posted Date
Nov 19, 2025
Due Date
Dec 10, 2025
Release: Nov 19, 2025
Hawaii Department of Transportation
Close: Dec 10, 2025
Provide construction support (cs) services for interstate route h-1, seismic retrofit.
AvailableDLA Maritime
Ring, oil control, NSN 5330014829913, Qty 3.
Posted Date
Nov 18, 2025
Due Date
Dec 3, 2025
Release: Nov 18, 2025
DLA Maritime
Close: Dec 3, 2025
Ring, oil control, NSN 5330014829913, Qty 3.
AvailableOrange Co Sanitation District
Work includes support buildings seismic improvements. Construct structural improvements to staff occupied buildings and 12-kv service center at plant no. 1 to reduce the risk of failure during a significant seismic event.
Posted Date
Sep 18, 2025
Due Date
Dec 10, 2025
Release: Sep 18, 2025
Orange Co Sanitation District
Close: Dec 10, 2025
Work includes support buildings seismic improvements. Construct structural improvements to staff occupied buildings and 12-kv service center at plant no. 1 to reduce the risk of failure during a significant seismic event.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →