Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
NAVSEA Warfare Centers
Large hydrostatic test chamber design and fabrication.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Hanford Tank Waste Operations & Closure LLC (Contractor)
Provide software development and programmable logic controller (PLC) design and fabrication for the 222-S Laboratory's vacuum control system.
Posted Date
Nov 10, 2025
Due Date
Dec 5, 2025
Release: Nov 10, 2025
Hanford Tank Waste Operations & Closure LLC (Contractor)
Close: Dec 5, 2025
Provide software development and programmable logic controller (PLC) design and fabrication for the 222-S Laboratory's vacuum control system.
AvailableTroop Support's Construction & Equipment
Hydrostatic release, NSN 4220222580685, Qty 250 UI Ea
Posted Date
Nov 17, 2025
Due Date
Nov 28, 2025
Release: Nov 17, 2025
Troop Support's Construction & Equipment
Close: Nov 28, 2025
Hydrostatic release, NSN 4220222580685, Qty 250 UI Ea
AvailableFederal Aviation Administration
Work includes, but is not limited to: a. Design of new slatwall console system for center console. B. Demolition and removal of existing center consoles. C. Fabrication and installation of new center console slatwall, mounts, miscellaneous accessories, and equipment. All consoles are to be secured per the ibc for seismic design (assume i factor 1. 5) d. Installation/relocation of electrical circuits and light switches to the new console. All electrical work must be in compliance with faa specification 1217h and faa-std- 019g. E. Installation of new multipoint ground plates and grounding cabling to each section of the new consoles. F. Provide electronic copies of shop drawings and plans. Drawings and plans must be in autocad. Dwg format. See attached file.
Posted Date
Mar 18, 2025
Due Date
May 15, 2028
Release: Mar 18, 2025
Federal Aviation Administration
Close: May 15, 2028
Work includes, but is not limited to: a. Design of new slatwall console system for center console. B. Demolition and removal of existing center consoles. C. Fabrication and installation of new center console slatwall, mounts, miscellaneous accessories, and equipment. All consoles are to be secured per the ibc for seismic design (assume i factor 1. 5) d. Installation/relocation of electrical circuits and light switches to the new console. All electrical work must be in compliance with faa specification 1217h and faa-std- 019g. E. Installation of new multipoint ground plates and grounding cabling to each section of the new consoles. F. Provide electronic copies of shop drawings and plans. Drawings and plans must be in autocad. Dwg format. See attached file.
Noyo Harbor District
Noyo Harbor District in partnership with West Business Development Center is seeking proposals from a qualified firm with specific experience designing and fabricating signage for public wayfinding. The selected firm will create one design that will be installed at both the northern and southern entry points of Noyo Harbor in Fort Bragg, California. This signage will serve as both a visual introduction and a symbolic threshold to the harbor experience.
Posted Date
Oct 19, 2025
Due Date
Nov 20, 2025
Release: Oct 19, 2025
Noyo Harbor District
Close: Nov 20, 2025
Noyo Harbor District in partnership with West Business Development Center is seeking proposals from a qualified firm with specific experience designing and fabricating signage for public wayfinding. The selected firm will create one design that will be installed at both the northern and southern entry points of Noyo Harbor in Fort Bragg, California. This signage will serve as both a visual introduction and a symbolic threshold to the harbor experience.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis