Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Virginia Department of Transportation
Work includes 2 EA of inlet protection type B; 500 LF of temp. silt fence type A; 175 TN of asphalt concrete ty. SM-12.5E construction; 190 LF of 2" bored conduit; 1,380 LF of 2" PVC conduit; see attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Virginia Department of Transportation
Work includes 1 LS of clearing and grubbing; 57 LF of 12" concrete pipe; 73 LF of 23" x 14" elliptical concrete pipe; 232 CY of regualar excavation; see attached file.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Virginia Department of Transportation
Close: Dec 17, 2025
Work includes 1 LS of clearing and grubbing; 57 LF of 12" concrete pipe; 73 LF of 23" x 14" elliptical concrete pipe; 232 CY of regualar excavation; see attached file.
AvailableVirginia Department of Transportation
Work includes 1 LS of clearing and grubbing; 35.200 CY of concrete class A4 box culvert; 3,679 LB of corrosion resistant reinforce steel class I; 48 LF of 15" storm sewer pipe; see attached file.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Virginia Department of Transportation
Close: Dec 17, 2025
Work includes 1 LS of clearing and grubbing; 35.200 CY of concrete class A4 box culvert; 3,679 LB of corrosion resistant reinforce steel class I; 48 LF of 15" storm sewer pipe; see attached file.
AvailableVirginia Department of Transportation
Work include 8 LF 15" pipe; 164 LF 18" conc. Pipe; 177 CY regular excavation; 137 CY siltation control excavation; 783 LF temp. Silt fence type a; 412 CY borrow excavation; 633 saw-cut asphalt concrete asphalt; 64 LF crossdrain cd-2; 122 SY paved ditch pg-2a; 444 LF curb, std. Cg-3; 256 SY demo. Of pavement flexible; 610 SF temporary sign; 374 LF temp. Pvmt mrkg ty. A, 4"; 1067 SY flexible pave. Planing 0"- 2"; 96 LF sign post stp-1, 2", 14 gauge; 1,150 LF type b class i pvmt line mrkg 6"; 40 LF type b class ii pvmt line mrkg 24".
Posted Date
-
Due Date
Nov 19, 2025
Virginia Department of Transportation
Close: Nov 19, 2025
Work include 8 LF 15" pipe; 164 LF 18" conc. Pipe; 177 CY regular excavation; 137 CY siltation control excavation; 783 LF temp. Silt fence type a; 412 CY borrow excavation; 633 saw-cut asphalt concrete asphalt; 64 LF crossdrain cd-2; 122 SY paved ditch pg-2a; 444 LF curb, std. Cg-3; 256 SY demo. Of pavement flexible; 610 SF temporary sign; 374 LF temp. Pvmt mrkg ty. A, 4"; 1067 SY flexible pave. Planing 0"- 2"; 96 LF sign post stp-1, 2", 14 gauge; 1,150 LF type b class i pvmt line mrkg 6"; 40 LF type b class ii pvmt line mrkg 24".
AvailableVirginia Department of Transportation
Work include 100 LF 15" storm sewer pipe; 16 LF 18" pipe; 295 LF 18" conc. Pipe; 38 LF 18" storm sewer pipe; 155 LF pipe pipe rehabilitation 30" category a or b; 2,689 CY regular excavation; 1,489 CY borrow excavation; 921 CY embankment; 1,068 CY siltation control excavation; 1,598 LF temp. Silt fence type b; 1,134 LF temp. Silt fence type a; 524 CY storm water man. Basin excav; 2,606 LF saw-cut asph conc full depth saw cut; 78 LF underdrain ud-4; 152 LF outlet pipe; 2,768 SY geotextile drainage fabric; 713 LF guardrail; 998 LF remove existing guardrail; 3,150 LF traffic barrier service mb-11a.
Posted Date
Oct 14, 2025
Due Date
Nov 19, 2025
Release: Oct 14, 2025
Virginia Department of Transportation
Close: Nov 19, 2025
Work include 100 LF 15" storm sewer pipe; 16 LF 18" pipe; 295 LF 18" conc. Pipe; 38 LF 18" storm sewer pipe; 155 LF pipe pipe rehabilitation 30" category a or b; 2,689 CY regular excavation; 1,489 CY borrow excavation; 921 CY embankment; 1,068 CY siltation control excavation; 1,598 LF temp. Silt fence type b; 1,134 LF temp. Silt fence type a; 524 CY storm water man. Basin excav; 2,606 LF saw-cut asph conc full depth saw cut; 78 LF underdrain ud-4; 152 LF outlet pipe; 2,768 SY geotextile drainage fabric; 713 LF guardrail; 998 LF remove existing guardrail; 3,150 LF traffic barrier service mb-11a.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis