Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Division of Engineering Services - Seattle
Provide upgrades and roof replacement. This procurement is for the design and replacement of various HVAC equipment to ensure compliance with ASHRAE 170 Standards, as well as the membrane roof system. Replacement of the membrane roof system, including the vapor barrier, insulation, impact board, PVC membrane, parapet flashing, vents, roof drains, and other associated components. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Harris County
Work includes roof and skylight replacement.
Posted Date
Oct 31, 2025
Due Date
Dec 8, 2025
Release: Oct 31, 2025
Harris County
Close: Dec 8, 2025
Work includes roof and skylight replacement.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Harris County
Work includes roof and skylight replacement.
Posted Date
Oct 31, 2025
Due Date
Dec 8, 2025
Release: Oct 31, 2025
Harris County
Close: Dec 8, 2025
Work includes roof and skylight replacement.
AvailableDistrict of Columbia Department of General Services
DESIGN-BUILD services for school HVAC upgrades and roof replacement project.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
District of Columbia Department of General Services
Close: Dec 19, 2025
DESIGN-BUILD services for school HVAC upgrades and roof replacement project.
AvailableRhode Island Office of Energy Resources
Provide multiple roof replacements - maximum security, minimum security, high security, correctional industries building concurrently. Removal and replacement of existing roof assemblies at Maximum to include, but not limited to, vapor barrier, 4" to 12" of insulation, wood fiberboard board, membranes down to concrete deck, curbs, flashing, and edge metal. Removal of (2) existing nonfunctioning rooftop units and infill concrete deck with existing adjacent materials, new roof to be flush with existing. RIDOC is looking to be fully replaced with 2-ply modified bitumen, recovery board and tapered insulation.See attached file.
Posted Date
Nov 7, 2025
Due Date
Dec 15, 2025
Release: Nov 7, 2025
Rhode Island Office of Energy Resources
Close: Dec 15, 2025
Provide multiple roof replacements - maximum security, minimum security, high security, correctional industries building concurrently. Removal and replacement of existing roof assemblies at Maximum to include, but not limited to, vapor barrier, 4" to 12" of insulation, wood fiberboard board, membranes down to concrete deck, curbs, flashing, and edge metal. Removal of (2) existing nonfunctioning rooftop units and infill concrete deck with existing adjacent materials, new roof to be flush with existing. RIDOC is looking to be fully replaced with 2-ply modified bitumen, recovery board and tapered insulation.See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →