Retrieving RFP details
Release
Close
Nevada Department of Veterans Services
Kitchen and hallway repairs 1. Wall repair - hallway behind dishwasher (throughway area): remove deteriorated drywall and assess the extent of moisture damage. Replace affected drywall and insulation as needed. Apply antimicrobial treatment to exposed framing (if applicable). Finish wall to match existing surfaces. 2. Frp installation - kitchen wall behind dishwasher: install frp (fiberglass reinforced plastic) panels behind the dishwasher in the kitchen. Ensure coverage extends to all surfaces exposed to moisture or at risk of exposure. Panels to be properly adhered and sealed to prevent future water intrusion. 3. Grout repair - dishwasher floor area: remove and replace cracked or missing grout surrounding the base of the dishwasher. Replace or reset any compromised tiles. Seal grout for long-term moisture protection.
Kitchen General Repair *Re-Bid*
zip
Haverford Middle School
Supply, delivery and installation of kitchen equipment includes hot food serving counter; serving counter, cold food.
Munson Facilities
Work of this proposed contract comprises building construction, including general construction and roofing work. General construction contract: work includes fountain elms windows and plaza deck; and museum service stairs and granite base. Roofing contract: work includes re-roofing, waterproofing, and roof drain piping at the museum.
Washington State Department of Enterprise Services
Road surface & repair materials, including asphalt emulsions, sealants, concrete mix and repairs, & other roadway surface repair items.
Release
Oct 01, 2025
Close
Nov 14, 2025