Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Gwinnett County
Work includes installation of approx 5,600 LF of 8" dip and 950 LF of 12" dip water main including valves, fittings, hydrants, and joint restraint in a residential area offproject also includes restoration of grassing, curb and gutter, asphalt pavement, traffic control, erosional and sedimentation control, and abandonment of existing water mains and appurtenances throughout the project limits.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Chesterfield County
The work includes 1,680 LF of 8" water main: 1,460 LF of 6" water main. The work will involve work within the existing pavement, clearing, trenching backfilling and compaction, erosion and sediment control, work within easements and vdot right of way, coordination with property owners, reconnection of existing water services, traffic controls, pavement replacement, and other ancillary items.
Posted Date
Oct 24, 2025
Due Date
Dec 9, 2025
Release: Oct 24, 2025
Chesterfield County
Close: Dec 9, 2025
The work includes 1,680 LF of 8" water main: 1,460 LF of 6" water main. The work will involve work within the existing pavement, clearing, trenching backfilling and compaction, erosion and sediment control, work within easements and vdot right of way, coordination with property owners, reconnection of existing water services, traffic controls, pavement replacement, and other ancillary items.
AvailableCity of Prescott
Provide park water main replacement for the construction of proposed sidewalks.
Posted Date
Nov 11, 2025
Due Date
Dec 9, 2025
Release: Nov 11, 2025
City of Prescott
Close: Dec 9, 2025
Provide park water main replacement for the construction of proposed sidewalks.
AvailableTown of Littleville
Work consists of approximately 7,090 LF of potable water main (size varying from 2"to 6"), 2,690 LF of water service tubing (size varying from 3/4" to 2"), connections to existing water infrastructure and related appurtenance.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Town of Littleville
Close: Dec 17, 2025
Work consists of approximately 7,090 LF of potable water main (size varying from 2"to 6"), 2,690 LF of water service tubing (size varying from 3/4" to 2"), connections to existing water infrastructure and related appurtenance.
AvailableBorough of Bellefonte
Water main replacement.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
Borough of Bellefonte
Close: Nov 20, 2025
Water main replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis