This project will rehabilitate approximately 528 feet of 60- and 63-inch diameter reinforced concrete pipe siphon of the Joint Outfall F Unit 3A Trunk Sewer with cured-in-place pipe liner, rehabilitate approximately 4 siphon structures with a protective liner system, and all appurtenant work.
City of Salt Lake City
Rehabilitation of approximately 6,982 feet of 48-inch and 64-inch sewer trunk line by cipp lining, replacement of 1,637 feet of 64-inch sewer trunk line with new 66-inch frp, replacement and rehabilitation of several existing manholes along the sewer trunk line, and all associated dewatering, bypass pumping, and lateral connections required to complete the work.
City of Georgetown
Perform cure in place pipe (cipp) and sanitary sewer manhole rehabilitation work. Bypass Pumping Operations of Existing Sanitary Sewer, 1,277 LF of Cured-in-Place Pipe 12-in Sewer (Manhole to Manhole), All Depths (ML-15, ML-16, ML-18, & ML-19); 813 LF of Cured-in-Place Pipe 15-in Sewer (Manhole to Manhole), All Depths (ML-5, ML-6); 2,090 LF of Sewer Cleaning/Silt Removal Prior to CCTV- Heavy Cleaning (All Diameters); 12 EA of Reconnect Active Sewer Laterals to CIPP Lined Pipe, All Sizes All Depths; 12 EA of Service Lateral CIPP End Seal; 19 EA of Furnish and Install Flexible Chimney Seal, 24"; 6 EA of Repairing and Rebuilding Brickwork for Inverts, Benches, Walls, and Chimneys in Manholes (1818,1829,1830,1834,1837, and 1839), 173 VF of Sewer Manhole Monolithic Lining, 4-FT Dia. Manhole.
Rolling Creek Utility District
Work includes : sanitary sewer rehabilitation phase 1.