U.S. Army Engineer District Portland
Contractor to design and build up to sixteen new turbine runners and rewind up to sixteen generators.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
U.S. Army Engineer District Portland
Replace turbines. The scope includes everything necessary to design, test, manufacture and install up to 16 new turbine runners, as well as the refurbishment and/or replacement of other ancillary turbine components to include up to 16 generator rewinds.
Posted Date
Nov 12, 2025
Due Date
Nov 28, 2025
Release: Nov 12, 2025
U.S. Army Engineer District Portland
Close: Nov 28, 2025
Replace turbines. The scope includes everything necessary to design, test, manufacture and install up to 16 new turbine runners, as well as the refurbishment and/or replacement of other ancillary turbine components to include up to 16 generator rewinds.
AvailableU.S. Army Engineer District Portland
Contractor to design and build transportation and site access improvements. The scope of work includes the design and construction of a new public access road, modifying the existing road from Interstate 84 to the dam, adding additional contractor staging space, a new guard station building, a new canopy, a new auxiliary monitoring building (AMS) building, and providing electrical and sewer connections for future TRGR construction trailers near the current service building.
Posted Date
Nov 6, 2025
Due Date
Dec 15, 2025
Release: Nov 6, 2025
U.S. Army Engineer District Portland
Close: Dec 15, 2025
Contractor to design and build transportation and site access improvements. The scope of work includes the design and construction of a new public access road, modifying the existing road from Interstate 84 to the dam, adding additional contractor staging space, a new guard station building, a new canopy, a new auxiliary monitoring building (AMS) building, and providing electrical and sewer connections for future TRGR construction trailers near the current service building.
AvailableU.S. Army Engineer District Portland
Provide security systems upgrade. River hydroelectric power plant, of strategic importance in the federal columbia river power system due to its location and generation capacity. The work includes providing all labor, equipment, and materials required to complete construction of the John Day Powerhouse Security System Upgrades project per the Contract specifications and plan drawings. Replacing multiple light fixtures throughout John Day Dam Replacing the existing Electronic Security System (ESS) Power, lighting, and installation of server racks in server room Replacing existing ESS wiring as shown on drawings Providing Heating, Ventilation, and Air Conditioning (HVAC) to the server room. See attached file.
Posted Date
Oct 27, 2025
Due Date
Nov 19, 2025
Release: Oct 27, 2025
U.S. Army Engineer District Portland
Close: Nov 19, 2025
Provide security systems upgrade. River hydroelectric power plant, of strategic importance in the federal columbia river power system due to its location and generation capacity. The work includes providing all labor, equipment, and materials required to complete construction of the John Day Powerhouse Security System Upgrades project per the Contract specifications and plan drawings. Replacing multiple light fixtures throughout John Day Dam Replacing the existing Electronic Security System (ESS) Power, lighting, and installation of server racks in server room Replacing existing ESS wiring as shown on drawings Providing Heating, Ventilation, and Air Conditioning (HVAC) to the server room. See attached file.
DLA Aviation
Provide Case, turbine, nonair, NSN 2835004945726, Qty 2 UI Ea
Posted Date
Nov 13, 2025
Due Date
Nov 21, 2025
Release: Nov 13, 2025
DLA Aviation
Close: Nov 21, 2025
Provide Case, turbine, nonair, NSN 2835004945726, Qty 2 UI Ea
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis