Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 80 SF substructure repair (formed); 250 SF half-sole repair; 21,450 SF cleaning and epoxy coating; 14,339 SY concrete crack filler; 11,600 SF surface preparation for recoating structural steel; 11,600 SF field application of inorganic zinc primer; 11,600 SF intermediate field coat (system G); 11600. 000 sqft finish field coat (system G); 2 EA. misc. Stiffener repair; 151 LF strip seal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work consist of approx 21,450 SF cleaning and epoxy coating; 14,339 SY concrete crack filler; 27,948 LF pavement marking removal; 8,305 LF 6" pavement marking; 6,352 LF 6" pavement marking.
Posted Date
Aug 14, 2025
Due Date
Dec 12, 2025
Release: Aug 14, 2025
Close: Dec 12, 2025
The work consist of approx 21,450 SF cleaning and epoxy coating; 14,339 SY concrete crack filler; 27,948 LF pavement marking removal; 8,305 LF 6" pavement marking; 6,352 LF 6" pavement marking.
Work includes 1,900 SF cleaning and epoxy coating; 744. 000 sqyd seal coat aggregate, grade b1l; 129 emulsified asphalt, seal coat; vgvb; mgs guardrail, 8 ft. Posts, 6' - 3" Spacing; 301,655 LF 4" White class 1 pavement marking paint (18-mil, type p beads); 22. 000 lf; temporary removable marking tape, 24" , white; 2000 LF temporary removable marking tape 4" , yellow; 200 EA. channelizer (trim-line); 2,489 gal prime-liquid asphalt MC 800; 509 LF curb blackout.
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Close: Dec 12, 2025
Work includes 1,900 SF cleaning and epoxy coating; 744. 000 sqyd seal coat aggregate, grade b1l; 129 emulsified asphalt, seal coat; vgvb; mgs guardrail, 8 ft. Posts, 6' - 3" Spacing; 301,655 LF 4" White class 1 pavement marking paint (18-mil, type p beads); 22. 000 lf; temporary removable marking tape, 24" , white; 2000 LF temporary removable marking tape 4" , yellow; 200 EA. channelizer (trim-line); 2,489 gal prime-liquid asphalt MC 800; 509 LF curb blackout.
Work includes 425 LF MGS guardrail; 4 EA bridge approach transition section (regular/no curb); 40 LF NU 53, prestressed concrete NU-girder; 20,250 LB reinforcing steel (bridges); 28 EA. slab drain; 613 LF type D barrier; 246 LF galvanized structural steel piles (14"); 4 EA. video camera inspection; 52. 000 L 18". Pipe group A; 1.760 LF 4 in. White class 1 pavement marking paint (18-mil, type p beads); 959. 000 lf 4 in. Yellow class 1 pavement marking paint (18-mil, type p beads).
Posted Date
Nov 6, 2025
Due Date
Dec 12, 2025
Release: Nov 6, 2025
Close: Dec 12, 2025
Work includes 425 LF MGS guardrail; 4 EA bridge approach transition section (regular/no curb); 40 LF NU 53, prestressed concrete NU-girder; 20,250 LB reinforcing steel (bridges); 28 EA. slab drain; 613 LF type D barrier; 246 LF galvanized structural steel piles (14"); 4 EA. video camera inspection; 52. 000 L 18". Pipe group A; 1.760 LF 4 in. White class 1 pavement marking paint (18-mil, type p beads); 959. 000 lf 4 in. Yellow class 1 pavement marking paint (18-mil, type p beads).
Bridge rehabilitation.
Posted Date
Nov 20, 2025
Due Date
Dec 19, 2025
Release: Nov 20, 2025
Close: Dec 19, 2025
Bridge rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis