Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Vista
Roof renovation work ncludes removing existing roofing materials and gutters, replacing decking material as required, and installing products from The Garland Company, Inc., which will be purchased by the Owner. Materials include Prostop FR Primer, SA Base Primer, SA Base IV, Stressply IV Plus UV Mineral, Flashing Bond, Tuff Coat White, Tuff Stuff Sealant, Liquitec, Cool Sil, Tuff Flash.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Caruthersville
The project includes a roof replacement on the diane sayre recreation center. The project involves removing the existing membrane roofing and installing new TPO roofing membrane, and replacing the existing roof translucent panels at the natatorium.
Posted Date
Nov 26, 2025
Due Date
Dec 16, 2025
Release: Nov 26, 2025
City of Caruthersville
Close: Dec 16, 2025
The project includes a roof replacement on the diane sayre recreation center. The project involves removing the existing membrane roofing and installing new TPO roofing membrane, and replacing the existing roof translucent panels at the natatorium.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Tulsa
Roof replacement.
Posted Date
Nov 11, 2025
Due Date
Dec 12, 2025
Release: Nov 11, 2025
City of Tulsa
Close: Dec 12, 2025
Roof replacement.
AvailableMenominee Area Public Schools
Roof replacement project. Work includes complete removal of existing single ply and coal tar pitch built-up roof systems, asbestos abatement, new insulation and roof system, new steel framing with new metal wall cladding.
Posted Date
Nov 24, 2025
Due Date
Dec 8, 2025
Release: Nov 24, 2025
Menominee Area Public Schools
Close: Dec 8, 2025
Roof replacement project. Work includes complete removal of existing single ply and coal tar pitch built-up roof systems, asbestos abatement, new insulation and roof system, new steel framing with new metal wall cladding.
AvailableMurrieta Valley Unified School District
Work includes Roof Replacement at school.
Posted Date
Nov 17, 2025
Due Date
Dec 15, 2025
Release: Nov 17, 2025
Murrieta Valley Unified School District
Close: Dec 15, 2025
Work includes Roof Replacement at school.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →