Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes to upgrade the current at&t copper infrastructure to ase fiber, directional bore approx 175 LF for 2" HDPE conduit with a minimum thickness of SDR 11, install new (30" x 48" approx) hand hole adjacent to existing control hut.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes to upgrade the current at&t copper infrastructure to ase fiber, directional bore approx 175 LF for 2" HDPE conduit with a minimum thickness of SDR 11, install new (30" x 48" approx) hand hole adjacent to existing control hut.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Close: Dec 17, 2025
Work includes to upgrade the current at&t copper infrastructure to ase fiber, directional bore approx 175 LF for 2" HDPE conduit with a minimum thickness of SDR 11, install new (30" x 48" approx) hand hole adjacent to existing control hut.
AvailablePremium
Access the largest public sector contact database
Install new 24-strand fiber optic cable(s).
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Close: Dec 18, 2025
Install new 24-strand fiber optic cable(s).
AvailableWireless Upgrades to include district wide upgrades to wireless access points (WAPs), and associated network gear.
Posted Date
Nov 24, 2025
Due Date
Jan 7, 2026
Release: Nov 24, 2025
Close: Jan 7, 2026
Wireless Upgrades to include district wide upgrades to wireless access points (WAPs), and associated network gear.
AvailableAll work associated with the Control Room Upgrades minus HVAC and Electrical work, All work associated with the Control Room Upgrades Electrical work, All work associated with the Control Room Upgrades HVAC work, Lump Sum of all work associated with the Control Room Upgrades.
Posted Date
Oct 3, 2025
Due Date
Jan 6, 2026
Release: Oct 3, 2025
Close: Jan 6, 2026
All work associated with the Control Room Upgrades minus HVAC and Electrical work, All work associated with the Control Room Upgrades Electrical work, All work associated with the Control Room Upgrades HVAC work, Lump Sum of all work associated with the Control Room Upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis