Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Inland Empire Health Plan
Inland Empire Health Plan is soliciting bids to install four 2-ton mini-split HVAC systems to serve the 3rd floor IDF room of its 9500 Building. A mandatory job walk is scheduled at 9500 Cleveland Ave., Rancho Cucamonga, CA 91730, and bids are due by Dec 11, 2025 at 2:00 PM PST.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Inland Empire Health Plan
Project include furnish and install four (4) TCL, Daikin "Or Equal" 2-ton split systems, Install condensers on rooftop above room, secured on blocks, Install refrigerant lines for each unit, Core drill roof/ceiling for refrigerant lines and electrical connections, Mount fan coil units on wall in designated locations, Seal all openings made for installation. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 11, 2025
Release: Nov 19, 2025
Inland Empire Health Plan
Close: Dec 11, 2025
Project include furnish and install four (4) TCL, Daikin "Or Equal" 2-ton split systems, Install condensers on rooftop above room, secured on blocks, Install refrigerant lines for each unit, Core drill roof/ceiling for refrigerant lines and electrical connections, Mount fan coil units on wall in designated locations, Seal all openings made for installation. See attached file.
AvailableCity of Cincinnati
3rd Floor Conference Room Expansion. Conference Room Expansion will add much needed square feet of useable space to our conference room on the 3rd floor. In order to add this space an existing wall will need to be demolished and removed. The wall is metal stud construction and 5/8" fire rated drywall. There is electric and data in the wall which will need to be relocated once the new wall is built. The current doors will have to be re-used and relocated which also requires the fire suppression system to be moved. Once construction is complete, the flooring and cove base will need to be replaced and all affected walls painted/repaired. Bidders are to complete the Excel pricing sheet in the shaded areas (Volume #3). Prices bid are firm and fixed for the project.
Posted Date
Nov 10, 2025
Due Date
Dec 2, 2025
Release: Nov 10, 2025
City of Cincinnati
Close: Dec 2, 2025
3rd Floor Conference Room Expansion. Conference Room Expansion will add much needed square feet of useable space to our conference room on the 3rd floor. In order to add this space an existing wall will need to be demolished and removed. The wall is metal stud construction and 5/8" fire rated drywall. There is electric and data in the wall which will need to be relocated once the new wall is built. The current doors will have to be re-used and relocated which also requires the fire suppression system to be moved. Once construction is complete, the flooring and cove base will need to be replaced and all affected walls painted/repaired. Bidders are to complete the Excel pricing sheet in the shaded areas (Volume #3). Prices bid are firm and fixed for the project.
AvailableNorth Carolina Department of Transportation
Renovation of the transportation complex, 3rd floor financial management division alteration & art museum room 308 renovation.
Posted Date
Nov 20, 2025
Due Date
Dec 11, 2025
Release: Nov 20, 2025
North Carolina Department of Transportation
Close: Dec 11, 2025
Renovation of the transportation complex, 3rd floor financial management division alteration & art museum room 308 renovation.
AvailableNorth Carolina Department of Transportation
Renovation of the NCDOT transportation complex, 3rd Floor financial management division alteration & art museum room 308 renovation.
Posted Date
-
Due Date
Dec 11, 2025
North Carolina Department of Transportation
Close: Dec 11, 2025
Renovation of the NCDOT transportation complex, 3rd Floor financial management division alteration & art museum room 308 renovation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis