Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Texas Military Department
Work includes install closed cell spray polyurethane foam on ceiling.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Middlesex County
Invitation for Bid for the Center for the Sciences to remove and replace insulation and waterproofing systems on existing exterior ductwork, including removal/reinstallation of existing metal siding and repairs to waterproofing systems on exterior plenums. The solicitation was posted 2025-11-07 with a submission deadline of 2025-12-10 and is listed as a county/state IFB (non-federal), not a grant.
Posted Date
Nov 7, 2025
Due Date
Dec 10, 2025
Release: Nov 7, 2025
Middlesex County
Close: Dec 10, 2025
Invitation for Bid for the Center for the Sciences to remove and replace insulation and waterproofing systems on existing exterior ductwork, including removal/reinstallation of existing metal siding and repairs to waterproofing systems on exterior plenums. The solicitation was posted 2025-11-07 with a submission deadline of 2025-12-10 and is listed as a county/state IFB (non-federal), not a grant.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Kent County
Provide energy efficiency upgrades that include; air sealing, attic insulation, spray foam insulation and ASHRAE compliant ventilation components for 52 apartment units. See attached file.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Kent County
Close: Dec 18, 2025
Provide energy efficiency upgrades that include; air sealing, attic insulation, spray foam insulation and ASHRAE compliant ventilation components for 52 apartment units. See attached file.
AvailableKent County
Kent County solicits contractors for multi-family weatherization (mechanical ventilation and insulation) upgrades — air sealing, attic/floor/sill spray-foam and blown insulation, ASHRAE-compliant ventilation, LED lighting, duct/vent upgrades, etc. — for 52 apartment units at Camelot Woods 1 in Grand Rapids, MI. Awards will be split between mechanical and insulation contractors. Mandatory on-site pre-submission conference; federal-funded requiring Davis‑Bacon prevailing wages, SAM UEID, LCPtracker payroll reporting, and standard bid/performance/payment bond requirements. Project completion required by March 15, 2026.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Kent County
Close: Dec 18, 2025
Kent County solicits contractors for multi-family weatherization (mechanical ventilation and insulation) upgrades — air sealing, attic/floor/sill spray-foam and blown insulation, ASHRAE-compliant ventilation, LED lighting, duct/vent upgrades, etc. — for 52 apartment units at Camelot Woods 1 in Grand Rapids, MI. Awards will be split between mechanical and insulation contractors. Mandatory on-site pre-submission conference; federal-funded requiring Davis‑Bacon prevailing wages, SAM UEID, LCPtracker payroll reporting, and standard bid/performance/payment bond requirements. Project completion required by March 15, 2026.
AvailableCity of Boston
Retaining Wall Project.
Posted Date
Dec 1, 2025
Due Date
Dec 30, 2025
Release: Dec 1, 2025
City of Boston
Close: Dec 30, 2025
Retaining Wall Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →