Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Usmcfp Springfield
Insulation overlay and mineral board to be used in the manufacture of office furniture.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Washington County
Contract for roof overlay and lightning protection improvements includes, Roof surface preparation and cleaning. Installation of new insulation and overlay materials. Flashing and metal edge improvements. Reinstallation and reconnection of the existing lightning protection system. Proper sealing, testing, and cleanup of the work area.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
Washington County
Close: Dec 4, 2025
Contract for roof overlay and lightning protection improvements includes, Roof surface preparation and cleaning. Installation of new insulation and overlay materials. Flashing and metal edge improvements. Reinstallation and reconnection of the existing lightning protection system. Proper sealing, testing, and cleanup of the work area.
AvailableIndiana Department of Transportation
Bridge deck overlay and thin deck overlay. Work includes 1 LS clearing right of way; stormwater management; 1,162 SY of transition milling; 885 LF of joint adhesive; 13 LF of 6'3" spacing MGS W-beam guardrail; 50 SF of concrete structures patching; 368 SY of rigid bridge deck overlay; 368 SY of hydro demolition; pavement markings. See attached files for complete scope of work.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
Indiana Department of Transportation
Close: Dec 10, 2025
Bridge deck overlay and thin deck overlay. Work includes 1 LS clearing right of way; stormwater management; 1,162 SY of transition milling; 885 LF of joint adhesive; 13 LF of 6'3" spacing MGS W-beam guardrail; 50 SF of concrete structures patching; 368 SY of rigid bridge deck overlay; 368 SY of hydro demolition; pavement markings. See attached files for complete scope of work.
AvailableNaval Supply Systems Command (NAVSUP)
Insulation Blanket, NSN 1R-1660-LLHPAW530-V2, REF NR 901-369-211-121, QTY 1 Ea
Posted Date
Nov 15, 2025
Due Date
Dec 29, 2025
Release: Nov 15, 2025
Naval Supply Systems Command (NAVSUP)
Close: Dec 29, 2025
Insulation Blanket, NSN 1R-1660-LLHPAW530-V2, REF NR 901-369-211-121, QTY 1 Ea
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis