Retrieving RFP details
Release
Close
Maryland State Highway Administration
Install floor and wall coatings. The brine room is approx. 32' x 18' concrete area with a height of 17' block walls. The ceiling is metal with metal truss system. Ceiling and all ancillary / truss systems, shall be coated in a flat black industrial coating where compatible with those systems. See attached files and outside link.
Install Floor and Wall Coatings at the Salisbury Maintenance Shop's Brine Room (Request for Quote)
zip
City of College Park
Remodel of the fire station bunk room. The bunk room measures 46' X 27' and will be converted into individual cubicles and a small lounge area. See attached file.
LaPorte County
Remodel first floor restrooms and assessor's break room.
Montebello Unified School District
Replacement of linoleum flooring in both the boy's and girl's locker room restrooms. Toilets and partitions will have to be removed and replaced for the install of the new flooring. The work is to be done during the Fall Recess November 21-30, 2025
Release
Oct 29, 2025
Close
Nov 25, 2025