Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Maryland Transportation Authority
Work includes construction of new on-ramps to the i-95 nb etl, including steel bridges and highways in baltimore, md. Kokosing is seeking quotes for the above referenced project from certified dbe subcontractors and suppliers for the following types of work: clearing, milling & paving, concrete barrier & flatwork, electrical/its, fence & guardrail, maintenance of traffic, bridge & wall construction, painting, rebar/sip/stud installation, sawing & grooving, seeding & erosion controls, signs & pavement markings, and hauling
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Maryland Transportation Authority
The project includes additions of Ramps MB and MH to the I-95 and I-695 interchange. Ramp MH provides a connection from eastbound I-695 to Northbound (NB) I-95 ETL. Ramp MB provides a connection from westbound I-695 to NB I-95 ETL. Both these ramps merge into one lane before they go through the Toll Gantry on NB I-95 ETL. See outside link.
Posted Date
Oct 10, 2025
Due Date
Dec 3, 2025
Release: Oct 10, 2025
Maryland Transportation Authority
Close: Dec 3, 2025
The project includes additions of Ramps MB and MH to the I-95 and I-695 interchange. Ramp MH provides a connection from eastbound I-695 to Northbound (NB) I-95 ETL. Ramp MB provides a connection from westbound I-695 to NB I-95 ETL. Both these ramps merge into one lane before they go through the Toll Gantry on NB I-95 ETL. See outside link.
AvailableColorado Department of Transportation
Project work consists of bridge preventative maintenance at the I-270 and I-25 interchange.
Posted Date
-
Due Date
Dec 5, 2025
Colorado Department of Transportation
Close: Dec 5, 2025
Project work consists of bridge preventative maintenance at the I-270 and I-25 interchange.
AvailableConnecticut Office of the Attorney General
I-91/I-691/Route 15 Interchange Southbound Improvements in the Cities.
Posted Date
Sep 23, 2025
Due Date
Dec 10, 2025
Release: Sep 23, 2025
Connecticut Office of the Attorney General
Close: Dec 10, 2025
I-91/I-691/Route 15 Interchange Southbound Improvements in the Cities.
AvailableSouth Carolina Department of Transportation
Work includes clearing & grubbing within roadway, removal & disposal of existing curb 63.000 LF, removal of exist guardrail 286.000 LF, removal & disposal of existing bridge, unclassified excavation 41,146.000 CY, borrow excavation 1,279,716.000 CY, borrow pit set-up, muck excavation 44,830.000 CY, 18" diameter pipe additional foundation work 462.000 LF, 36" diameter pipe additional foundation work 845.000 LF, geotextile, separation 27,202.000 SY, channel relocation 357.000 LF, structure excavation for culverts 1,993.000 CY, stone bridge lift material 31,279.000 Ton granular bridge lift material 44,830.000 CY fine grading 64,953.000 SY. See attached file.
Posted Date
Nov 4, 2025
Due Date
Dec 9, 2025
Release: Nov 4, 2025
South Carolina Department of Transportation
Close: Dec 9, 2025
Work includes clearing & grubbing within roadway, removal & disposal of existing curb 63.000 LF, removal of exist guardrail 286.000 LF, removal & disposal of existing bridge, unclassified excavation 41,146.000 CY, borrow excavation 1,279,716.000 CY, borrow pit set-up, muck excavation 44,830.000 CY, 18" diameter pipe additional foundation work 462.000 LF, 36" diameter pipe additional foundation work 845.000 LF, geotextile, separation 27,202.000 SY, channel relocation 357.000 LF, structure excavation for culverts 1,993.000 CY, stone bridge lift material 31,279.000 Ton granular bridge lift material 44,830.000 CY fine grading 64,953.000 SY. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis