Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 3,478 CY excavation; 500 CY excavation of subgrade; 5,640 SY curing coat; 5,640 SY cement stabilized subgrade, 12 inches deep; 566 LF curb ramp; 617 SY topsoil; 278 SY repair seeding and mulching; 7 SY erosion control mat; 75,000 EA erosion control; 0.30 CY concrete masonry; 2,609 LF 6" base pipe underdrains; 50 LF aggregate drains; 1 EA manhole, no. 3 with 96" base i. D. And 9" weir; 239 LF 6" conduit, type f for underdrain outlets; 60 LF 18" conduit, type b; 5 EA manhole, no. 3; 849 CY asphalt concrete base; 501 GAL non-tracking tack coat; 78 LF pavement marking, misc.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Delaware County solicits construction bids for the Hyatts Road and S. Section Line Road roundabout (roadway/roundabout construction). Bidders must submit electronically via BidExpress, register on the platform, provide bid security (bid bond 100% of bid or certified check 10% of bid) and a performance bond of 100% of total project cost, and comply with Ohio prevailing wage requirements. Work must be completed by August 31, 2026 (estimated start January 26, 2026).
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
Delaware County solicits construction bids for the Hyatts Road and S. Section Line Road roundabout (roadway/roundabout construction). Bidders must submit electronically via BidExpress, register on the platform, provide bid security (bid bond 100% of bid or certified check 10% of bid) and a performance bond of 100% of total project cost, and comply with Ohio prevailing wage requirements. Work must be completed by August 31, 2026 (estimated start January 26, 2026).
AvailablePeru west section line road bridge replacement design/build project.
Posted Date
Oct 31, 2025
Due Date
Dec 18, 2025
Release: Oct 31, 2025
Close: Dec 18, 2025
Peru west section line road bridge replacement design/build project.
AvailableDelaware County solicits bids for construction of a roundabout at Peachblow Road and Piatt Road (DEL-CR098-1.58). Bidders must submit electronically via BidExpress, provide bid security (100% bid bond or 10% certified check) and a 100% performance bond, and comply with Ohio prevailing wage requirements (ORC Chapter 4115). Contractor registration on BidExpress is required. Owner: Delaware County Board of Commissioners. Work must be completed by July 31, 2026 (estimated start Jan 26, 2026).
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
Delaware County solicits bids for construction of a roundabout at Peachblow Road and Piatt Road (DEL-CR098-1.58). Bidders must submit electronically via BidExpress, provide bid security (100% bid bond or 10% certified check) and a 100% performance bond, and comply with Ohio prevailing wage requirements (ORC Chapter 4115). Contractor registration on BidExpress is required. Owner: Delaware County Board of Commissioners. Work must be completed by July 31, 2026 (estimated start Jan 26, 2026).
Work includes 1 LS clearing and grubbing; 7,758 CY excavation; 260 SF curb ramp; 280 CY topsoil; 2,710 SY seeding and mulching; 126 SY repair seeding and mulching; 2.74 CY concrete masonry; 2,911 LF 6" base pipe underdrains; 315 lf 6" conduit, type f for underdrain outlets; 73 LF 12" conduit, type d; 16 EA manhole; 2 CY asphalt concrete base; 628 GAL non-tracking tack coat; 218 CY asphalt concrete surface course; 3,106 LF combination curb and gutter, type 2; 617 SY 4" concrete traffic island; 60 LF 4" conduit, type f for underdrain outlet; 145 LF trench in paved area.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
Work includes 1 LS clearing and grubbing; 7,758 CY excavation; 260 SF curb ramp; 280 CY topsoil; 2,710 SY seeding and mulching; 126 SY repair seeding and mulching; 2.74 CY concrete masonry; 2,911 LF 6" base pipe underdrains; 315 lf 6" conduit, type f for underdrain outlets; 73 LF 12" conduit, type d; 16 EA manhole; 2 CY asphalt concrete base; 628 GAL non-tracking tack coat; 218 CY asphalt concrete surface course; 3,106 LF combination curb and gutter, type 2; 617 SY 4" concrete traffic island; 60 LF 4" conduit, type f for underdrain outlet; 145 LF trench in paved area.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis