Retrieving RFP details
Release
Close
Gadsden County
Work inludes replacement of all windows and doors and ATS protection.
City of Sarasota
Saprito Pier- Hurricane Damage and Recovery. The Tony Saprito Pier (987 John Ringling Causeway) was heavily damaged during the hurricane season in 2024. The City requires a Contractor to perform all services including but not limited to those required to repair, restore, and enhance resiliency for the City's infrastructure.
Pueblo County
Provide conduct a comprehensive capital needs assessment (cna) the purpose of this assessment is to evaluate the current condition of the city's assets, identify necessary capital improvements, and prioritize these needs to ensure the efficient allocation of resources. The assessment will identify critical infrastructure needs, accessibility improvements, and strategies to enhance equity, self-sufficiency, and service delivery to the homeless population.
Highline College
3 EA Demo interiors of existing Wattstopper panels; 3 EA Install retrofit kits in existing enclosures; 1 EA Install/ power network cabinet; 3 EA Pull Wattstopper cable between panels; 2 EA Startup with PLS technician; 20 EA Install retrofit switches; 6 EA Install network power boosters; 1 EA Wattstopper retrofit package.
Release
Oct 10, 2025
Close
Nov 10, 2025