Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Soliciting proposals for design/build services on two hydroelectric projects.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project is an upgrade to a segment of the existing north bay aqueduct pipeline that parallels the Silverado trail and crosses the Conn creek floodway to provide water. The existing 12" pipeline under the streambed has been exposed to heavy scour and erosion and a concrete cap was placed over the pipeline during an emergency repair. The main purpose of the project is to remove the concrete cap and existing pipeline from the creek.
Posted Date
Nov 17, 2025
Due Date
Jan 7, 2026
Release: Nov 17, 2025
Close: Jan 7, 2026
This project is an upgrade to a segment of the existing north bay aqueduct pipeline that parallels the Silverado trail and crosses the Conn creek floodway to provide water. The existing 12" pipeline under the streambed has been exposed to heavy scour and erosion and a concrete cap was placed over the pipeline during an emergency repair. The main purpose of the project is to remove the concrete cap and existing pipeline from the creek.
Premium
Access the largest public sector contact database
Provide deicing fluid storage tank project project.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Provide deicing fluid storage tank project project.
AvailableProvide deicing fluid storage tank project project.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Provide deicing fluid storage tank project project.
AvailableConstruction of water system infrastructure: installation of approximately 3,140 linear feet of 8-inch waterline, upgrade of a 100 GPM booster pump station, construction of a new tank access road, and construction/installation of a 40,000-gallon water storage tank with foundation, valve vault, tank mixer, and related appurtenances.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Close: Jan 6, 2026
Construction of water system infrastructure: installation of approximately 3,140 linear feet of 8-inch waterline, upgrade of a 100 GPM booster pump station, construction of a new tank access road, and construction/installation of a 40,000-gallon water storage tank with foundation, valve vault, tank mixer, and related appurtenances.