Retrieving RFP details
Release
Close
Roanoke County
Work include renovation and additions.
Northwest Harris County Mud 5
Provide lift station no. 5, 6, and 11 generator additions. Scope of project to include but not limited to: three (3) natural gas generator additions including foundations, sound attenuating enclosures, load banks, duct banks, ATS, existing pavement saw cut and disposal, and all necessary electrical components and all appurtenances for a complete emergency natural gas generator electrical power system addition for the three (3) different existing lift stations, in accordance with plans and specifications. Site restoration. All work shall be complete in place.
Reese Technology Center
Project consists of the renovation of approx 8,500 SF interior space with minor adjustments of the exterior.
Whitfield County
Furnish and install a standby generator with automatic transfer switch to supply power to the fire station in the event of loss of commercial power. The structure is approx 2,400 SF and is serviced by a 225 amp electric panel. The facility has propane gas heat and an electric water heater.
Release
Oct 16, 2025
Close
Jan 01, 2026