Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Barre
Work performed under this project includes the repair/reconstruction of roadway and embankment stabilization along the southern side of the roadway which includes replacement of eroded material, soil nails and a retaining wall system.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Adams County
Supplying all labor and materials necessary for the proposed levee slope stabilization project. The project consists of slope stabilization, roadway grading, and constructing rip rap embankment.
Posted Date
Oct 31, 2025
Due Date
Dec 1, 2025
Release: Oct 31, 2025
Adams County
Close: Dec 1, 2025
Supplying all labor and materials necessary for the proposed levee slope stabilization project. The project consists of slope stabilization, roadway grading, and constructing rip rap embankment.
AvailableCity of Seattle
Replace three existing sandboxes with Type 227b junction boxes; install 96' of 12" DI pipe; install one new Type 240b catch basin with anchor block and extended sump on the south side of the street end; install 80' of 12" HDPE pipe to the base of the slope, including 20' of existing HDPE pipe to be reused; install 10' dissipation tee and new dissipation pad at the outfall; construct a reinforced soil slope (RSS); asphalt restoration at the street end; jute mat, much, seeding and slope restoration in the unimproved right-of-way; planting and landscape establishment.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
City of Seattle
Close: Dec 17, 2025
Replace three existing sandboxes with Type 227b junction boxes; install 96' of 12" DI pipe; install one new Type 240b catch basin with anchor block and extended sump on the south side of the street end; install 80' of 12" HDPE pipe to the base of the slope, including 20' of existing HDPE pipe to be reused; install 10' dissipation tee and new dissipation pad at the outfall; construct a reinforced soil slope (RSS); asphalt restoration at the street end; jute mat, much, seeding and slope restoration in the unimproved right-of-way; planting and landscape establishment.
AvailableUtah Department of Transportation
Work includes : 1 EA reconstruct monitoring well cap - raise; 18 SY remove asphalt pavement; 4,677 SY micro-surfacing; 29 ea flexible delineator post - type I; 1,075 LF precast concrete barrier - 32" f-shape, with 4 ft. Stabilization pins. See attached file.
Posted Date
Oct 25, 2025
Due Date
Dec 2, 2025
Release: Oct 25, 2025
Utah Department of Transportation
Close: Dec 2, 2025
Work includes : 1 EA reconstruct monitoring well cap - raise; 18 SY remove asphalt pavement; 4,677 SY micro-surfacing; 29 ea flexible delineator post - type I; 1,075 LF precast concrete barrier - 32" f-shape, with 4 ft. Stabilization pins. See attached file.
AvailablePearl River County
Pearl River County, Mississippi seeks proposals for bridge repair on Holden Road under the State Aid Bridge Program Project No. SABP-55(01). The project includes mobilization, clearing, grubbing, and various bridge-specific tasks such as cleaning and sealing joints, structural concrete work, and maintenance painting. The contract will be awarded to the lowest qualified bidder based on published quantities, with a contract time of 45 working days.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Pearl River County
Close: Dec 17, 2025
Pearl River County, Mississippi seeks proposals for bridge repair on Holden Road under the State Aid Bridge Program Project No. SABP-55(01). The project includes mobilization, clearing, grubbing, and various bridge-specific tasks such as cleaning and sealing joints, structural concrete work, and maintenance painting. The contract will be awarded to the lowest qualified bidder based on published quantities, with a contract time of 45 working days.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis