Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Union High School
Project consists of boiler, hhw piping & ahu replacement phase 1.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Palm Springs Unified School District
Palm Springs Unified School District is inviting sealed bids under CUPCCAA for the Boiler Plant Replacement at Desert Hot Springs High School, with a mandatory job walk on November 17, 2025. Bids are due December 1, 2025 at 2:00β―PM Pacific Time.
Posted Date
Nov 12, 2025
Due Date
Dec 1, 2025
Release: Nov 12, 2025
Palm Springs Unified School District
Close: Dec 1, 2025
Palm Springs Unified School District is inviting sealed bids under CUPCCAA for the Boiler Plant Replacement at Desert Hot Springs High School, with a mandatory job walk on November 17, 2025. Bids are due December 1, 2025 at 2:00β―PM Pacific Time.
AvailableCalifornia Military Department
Replace pumps, ahu, chiller, boiler, pumps on the cooling towers at the readiness center.
Posted Date
Nov 5, 2025
Due Date
Dec 8, 2025
Release: Nov 5, 2025
California Military Department
Close: Dec 8, 2025
Replace pumps, ahu, chiller, boiler, pumps on the cooling towers at the readiness center.
AvailableIowa State University
This project involves the direct replacement of an existing boiler with a new unit of equivalent capacity and function. The scope includes removal and disposal of the existing boiler, installation of the new boiler in the same location, reconnection to existing piping, electrical and control systems, and verification of proper operation. No changes to system design, capacity, or layout are anticipated.
Posted Date
Nov 7, 2025
Due Date
Nov 24, 2025
Release: Nov 7, 2025
Iowa State University
Close: Nov 24, 2025
This project involves the direct replacement of an existing boiler with a new unit of equivalent capacity and function. The scope includes removal and disposal of the existing boiler, installation of the new boiler in the same location, reconnection to existing piping, electrical and control systems, and verification of proper operation. No changes to system design, capacity, or layout are anticipated.
AvailableDaytona Beach Housing Authority
Sanitary Clay Piping Replacement.
Posted Date
-
Due Date
Nov 26, 2025
Release: -
Daytona Beach Housing Authority
Close: Nov 26, 2025
Sanitary Clay Piping Replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis