Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Heber City is soliciting sealed bids for construction of intersection improvements at 980 South Mill Road to improve traffic flow and pedestrian safety, including removal/installation of asphalt, curb, gutter, sidewalks, pedestrian ramps, traffic calming measures and pedestrian crossing systems. A pre‑bid conference is scheduled for 10:00 a.m. MST on January 6, 2026 at Heber City offices; questions are due to Alex White by January 8, 2026 at 2:00 PM. Sealed bids will be received at Heber City (75 North Main, Heber, Utah) until 2:00 p.m. MST, January 13, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of intersection improvements at 980 South Mill Road, Heber City, Utah. This includes removal of existing asphalt, curb and gutter, and sidewalk; installation of new curb and gutter, sidewalk improvements, and pedestrian crossing infrastructure; traffic calming measures; and re-striping of crosswalks, driving, and bike lanes.
Posted Date
Dec 13, 2025
Due Date
Jan 13, 2026
Release: Dec 13, 2025
Close: Jan 13, 2026
Construction of intersection improvements at 980 South Mill Road, Heber City, Utah. This includes removal of existing asphalt, curb and gutter, and sidewalk; installation of new curb and gutter, sidewalk improvements, and pedestrian crossing infrastructure; traffic calming measures; and re-striping of crosswalks, driving, and bike lanes.
AvailableIntersection improvements.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Intersection improvements.
AvailableWork includes 2,217.2600 SF construction signs; 40 CY excavation, test pits; 1,545 SY HMA milling, 3" or less; 242 SY dense graded aggregate base course, 6" thick; 82 TN hot mix asphalt base course, 19m64, 4" thk; 235 GAL tack coat; 100 LF monolithic white concrete header curb - variable height; 350 SF concrete sidewalk, 4" thick; 664 LF traffic stripes, long life, epoxy resin 4"; 1,369 SF traffic markings, thermoplastic; 880 LF traffic signal cable, 2 conductor; 53 SY HMA pavement repair; 1 LS asphalt price adjustment; 600 LF temporary chain-link fence, 6' high.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
Work includes 2,217.2600 SF construction signs; 40 CY excavation, test pits; 1,545 SY HMA milling, 3" or less; 242 SY dense graded aggregate base course, 6" thick; 82 TN hot mix asphalt base course, 19m64, 4" thk; 235 GAL tack coat; 100 LF monolithic white concrete header curb - variable height; 350 SF concrete sidewalk, 4" thick; 664 LF traffic stripes, long life, epoxy resin 4"; 1,369 SF traffic markings, thermoplastic; 880 LF traffic signal cable, 2 conductor; 53 SY HMA pavement repair; 1 LS asphalt price adjustment; 600 LF temporary chain-link fence, 6' high.
Work includes 2,217.2600 SF construction signs; 40 CY excavation, test pits; 1,545 SY HMA milling, 3" or less; 242 SY dense graded aggregate base course, 6" thick; 82 TN hot mix asphalt base course, 19m64, 4" thk; 235 GAL tack coat; 100 LF monolithic white concrete header curb - variable height; 350 SF concrete sidewalk, 4" thick; 664 LF traffic stripes, long life, epoxy resin 4"; 1,369 SF traffic markings, thermoplastic; 880 LF traffic signal cable, 2 conductor; 53 SY HMA pavement repair; 1 LS asphalt price adjustment; 600 LF temporary chain-link fence, 6' high.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
Work includes 2,217.2600 SF construction signs; 40 CY excavation, test pits; 1,545 SY HMA milling, 3" or less; 242 SY dense graded aggregate base course, 6" thick; 82 TN hot mix asphalt base course, 19m64, 4" thk; 235 GAL tack coat; 100 LF monolithic white concrete header curb - variable height; 350 SF concrete sidewalk, 4" thick; 664 LF traffic stripes, long life, epoxy resin 4"; 1,369 SF traffic markings, thermoplastic; 880 LF traffic signal cable, 2 conductor; 53 SY HMA pavement repair; 1 LS asphalt price adjustment; 600 LF temporary chain-link fence, 6' high.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis