Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sealed procurement for construction of public infrastructure at Harmony Science Academy — Missouri City, including sanitary sewer lift station, sanitary force main, public water line extension, traffic signal, right-turn lane/roadway widening, roadway striping, site utilities, stormwater management and related site work. Estimated budget ~$1.6M; 12‑month construction (Feb 2026–Feb 2027). Bidders must submit detailed cost estimates, schedules, qualifications, bonds/insurance, safety records and past-project references.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project will include, but is not limited to site preparation and grading, foundation and structural systems, mechanical, electrical, and plumbing systems (mep), site utilities and stormwater management, traffic signal installation. See outside link.
Posted Date
Dec 1, 2025
Due Date
Dec 15, 2025
Release: Dec 1, 2025
Close: Dec 15, 2025
The project will include, but is not limited to site preparation and grading, foundation and structural systems, mechanical, electrical, and plumbing systems (mep), site utilities and stormwater management, traffic signal installation. See outside link.
AvailableRelease: Jan 30, 2024
Close: Jan 1, 2028
Infrastructure Improvement Projects.
AvailableThe City of Southfield is seeking contractor qualifications for various capital infrastructure projects including utility replacement, pavement improvements, grading/drainage improvements, and associated restoration. The solicitation is a prequalification (Request for Qualification) to document contractor performance qualifications across categories such as water main replacement, gravity sewer replacement, concrete and asphalt paving, and roadway reconstruction.
Posted Date
Jan 30, 2024
Due Date
Jan 1, 2028
Release: Jan 30, 2024
Close: Jan 1, 2028
The City of Southfield is seeking contractor qualifications for various capital infrastructure projects including utility replacement, pavement improvements, grading/drainage improvements, and associated restoration. The solicitation is a prequalification (Request for Qualification) to document contractor performance qualifications across categories such as water main replacement, gravity sewer replacement, concrete and asphalt paving, and roadway reconstruction.
Work includes site demolition, earthwork, vapor barrier, concrete forming & accessories, concrete reinforcing, concrete for building, concrete for sidewalks and driveway, steel joist framing, steel roof decking, cold-formed metal framing, interior stud framing, sheathing, millwork, thermal and moisture protection, roof and deck insulation, roofing, hollow metal doors & frames, plastic laminate doors, overhead coiling doors, aluminum framed storefronts, aluminum windows, door hardware, glazing, safety & security window film, drywall, stucco, tiling, acoustical ceilings, resilient flooring: vct, base, and accessories. Gym flooring and striping, tile carpeting, see outside link.
Posted Date
Nov 4, 2025
Due Date
Dec 12, 2025
Release: Nov 4, 2025
Close: Dec 12, 2025
Work includes site demolition, earthwork, vapor barrier, concrete forming & accessories, concrete reinforcing, concrete for building, concrete for sidewalks and driveway, steel joist framing, steel roof decking, cold-formed metal framing, interior stud framing, sheathing, millwork, thermal and moisture protection, roof and deck insulation, roofing, hollow metal doors & frames, plastic laminate doors, overhead coiling doors, aluminum framed storefronts, aluminum windows, door hardware, glazing, safety & security window film, drywall, stucco, tiling, acoustical ceilings, resilient flooring: vct, base, and accessories. Gym flooring and striping, tile carpeting, see outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis