Retrieving RFP details
Release
Close
County of Maui
Sitework includes both onsite and offsite work. Offsite work includes main waterline connection and installation work. Installation of underground and aboveground utilities (water, sewer, electrical, etc. ); including a detention basin and leach field, water tank, driveways and parking areas, trash enclosure, diesel fuel tank, fuel dispenser; site lighting, landscaping, and transformer pad. Building construction includes a new fire station and apparatus bay and a new apparatus bay addition.
Signed ad page P43
Shawangunk Valley Fire District
Purchase of Fire apparatus and a Type 1 Ambulance.
Town of Boscawen
Construct two 22’x58’ additions to the existing fire station. Foundation: 4’ frost walls with 8” concrete slab. The additions will have 2”x6” wood frame walls with 10’8” ceiling height. New bearing walls (posts and beams) will be attached to the existing building (north and south walls) to support new roof trusses. The additions will have 22’ span mono pitch trusses, 3/12 pitch, framed to connect to the existing roof pitch. Interior will be finished with 5/8” sheetrock. Exterior siding and trim to match existing addition. Roofing: Metal or PVC. Roofing should include the entire main roof. Sprinkler system per NFPA Requirements.
City of Sanford
Work includes construction of a new 36,549 GSF fire & ems station with an alternate bid item to construction an additional 2,252 GSF apparatus bay. Site work consist of removal of existing building structures and utilities, excavation and prep for new building pad, below and above grade site utilities, parking lot, sidewalks, driveway, generator and dumpster and other work indicated in the contract documents. Building spaces includes vestibules, waiting area, offices, conference space, training, storage rooms, kitchenette, restrooms, janitors closets, mechanical room, electrical room, it room, bunkroom, bathrooms, restrooms, decon showers, laundry, fitness, dining, kitchen, living, apparatus bays, wash bay, vehicle bays, decon, laundry, turnout gear, scba area, ems secure storage watch room, stair tower, yard storage, work room, mezzanine and other work indicated in the contract documents
Release
Oct 03, 2025
Close
Nov 05, 2025