Retrieving RFP details
Release
Close
Town of Greenwich
The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: Demolition of existing boilers, and installation of new boilers, Demolition of the existing HVAC system in the Administration Building and installation of a new VRF system with DOAS Energy recovery unit, Demolition and installation of lighting systems in affected portions of the Administration Building, Electrical, Architectural, Structural improvements supplemental to the HVAC improvements, Commissioning of all new HVAC systems, service water heating systems and lighting systems.
Grass Island WWTP - HVAC Upgrades Project
zip
Evansville-Vanderburgh School Corporation
Work includes community school second floor renovation and HVAC upgrades.
Newburgh Enlarged City School District
HVAC upgrades and new installation and interior/exterior renovations work across schools specified within the 2019 bond project.
Stony Brook Regional Sewer Authority
The work includes comprehensive upgrades to the existing heating, ventilation, and air conditioning (HVAC) systems serving approximately 23,000 square feet of office, laboratory, and process areas in the Operations Building. The project involves the removal and replacement of multiple large-capacity air-handling units, installation of new variable air volume (VAV) terminal units, exhaust fans, ductwork, process and chilled-water piping, and a replacement of the existing control system with a direct digital control (DDC) system fully integrated with the facility's building management system. Work also includes new electrical power distribution and control wiring, fireproofing and insulation, and architectural restoration of all impacted areas.
Release
Sep 11, 2025
Close
Nov 03, 2025