Golden Ranch Municipal Utility District
Construction of clearing and grading of approximately 66.5 acres
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Harris County Mud 354
Work includes : 37,500 CY on-site excavation for phase 2 east grading; 69,500 CY fill to grade using fill from stockpile location; 115 EA rough lot grading; see attached file.
Posted Date
Nov 13, 2025
Due Date
Dec 4, 2025
Release: Nov 13, 2025
Harris County Mud 354
Close: Dec 4, 2025
Work includes : 37,500 CY on-site excavation for phase 2 east grading; 69,500 CY fill to grade using fill from stockpile location; 115 EA rough lot grading; see attached file.
AvailableBrazoria County Mud 48
Provide phase 1 detention and mass grading. Scope of project: 750,000 CY of detention excavation; 70 LF of 30", 60 LF of 48", 1200 LF of 54" storm sewer pipe and all appurtenances; 562 LF of 8'x6' RCB storm sewer pipe and all appurtenances.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
Brazoria County Mud 48
Close: Nov 20, 2025
Provide phase 1 detention and mass grading. Scope of project: 750,000 CY of detention excavation; 70 LF of 30", 60 LF of 48", 1200 LF of 54" storm sewer pipe and all appurtenances; 562 LF of 8'x6' RCB storm sewer pipe and all appurtenances.
AvailableCity of Crystal Lake
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
Posted Date
Oct 13, 2025
Due Date
Nov 20, 2025
Release: Oct 13, 2025
City of Crystal Lake
Close: Nov 20, 2025
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
AvailableCumberland County
Water distribution improvement.
Posted Date
-
Due Date
Dec 2, 2025
Cumberland County
Close: Dec 2, 2025
Water distribution improvement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis