Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Garland
Transmission System Storage Facility (TSSF).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Park City
Park City Municipal Corporation seeks engineering design services for a new heating system in a vehicle storage facility to replace the existing outdated system. The project involves designing mechanical and electrical plans, preparing bid documents, and providing design support during construction. The facility is approximately 33,000 SF with on-grade bus parking, and the new system must accommodate current vehicle types.
Posted Date
Nov 5, 2025
Due Date
Nov 20, 2025
Release: Nov 5, 2025
City of Park City
Close: Nov 20, 2025
Park City Municipal Corporation seeks engineering design services for a new heating system in a vehicle storage facility to replace the existing outdated system. The project involves designing mechanical and electrical plans, preparing bid documents, and providing design support during construction. The facility is approximately 33,000 SF with on-grade bus parking, and the new system must accommodate current vehicle types.
AvailableGreat Lakes and Ohio River Division
DESIGN BUILD project to Modernize the Potable Water Transmission and Storage Infrastructure by: Installation of a new dedicated 5.25 mile 20-inch transmission line of high-density polyethylene (HDPE) from potable water well field parallel to the existing failing 12-inch pipeline. The new transmission line will be installed adjacent to the gravel road, with required separation to prevent accidental damage to the existing potable water main during construction and future repairs. Installation of two new Storage Tanks (2.06 Mgal total capacity) along a ridge above FHL at an elevation of 1,250 ft (with provisions for future expansion). Construction of a 4,500 ft access road to access the new Storage Tank site. Upgrades to existing antiquated Potable Water Source Well facilities including ancillary equipment and building repairs including: chemical feed equipment, HVAC, life safety, security, SCADA-controls, and backup power systems.
Posted Date
Nov 12, 2025
Due Date
Nov 28, 2025
Release: Nov 12, 2025
Great Lakes and Ohio River Division
Close: Nov 28, 2025
DESIGN BUILD project to Modernize the Potable Water Transmission and Storage Infrastructure by: Installation of a new dedicated 5.25 mile 20-inch transmission line of high-density polyethylene (HDPE) from potable water well field parallel to the existing failing 12-inch pipeline. The new transmission line will be installed adjacent to the gravel road, with required separation to prevent accidental damage to the existing potable water main during construction and future repairs. Installation of two new Storage Tanks (2.06 Mgal total capacity) along a ridge above FHL at an elevation of 1,250 ft (with provisions for future expansion). Construction of a 4,500 ft access road to access the new Storage Tank site. Upgrades to existing antiquated Potable Water Source Well facilities including ancillary equipment and building repairs including: chemical feed equipment, HVAC, life safety, security, SCADA-controls, and backup power systems.
AvailableMarin Municipal Water Dist
Provide professional engineering services in support of updating the district's water treatment and transmission system master plan.
Posted Date
Oct 28, 2025
Due Date
Dec 10, 2025
Release: Oct 28, 2025
Marin Municipal Water Dist
Close: Dec 10, 2025
Provide professional engineering services in support of updating the district's water treatment and transmission system master plan.
AvailableElbert County
DESIGN-BUILD: Design and construction of a new 6,000 square foot facility. This facility will serve as evidence storage, administrative office space, and a drive-thru garage capable of accommodating RV-sized vehicles, with reinforced vault-style rooms for high-security evidence storage.
Posted Date
Oct 15, 2025
Due Date
Dec 3, 2025
Release: Oct 15, 2025
Elbert County
Close: Dec 3, 2025
DESIGN-BUILD: Design and construction of a new 6,000 square foot facility. This facility will serve as evidence storage, administrative office space, and a drive-thru garage capable of accommodating RV-sized vehicles, with reinforced vault-style rooms for high-security evidence storage.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis