Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Lawrence
Full exterior rehabilitation of a residential intensive care facility. Remove and replace existing roofing with Owens Corning Duration (or equivalent) asphalt shingles and accessories. Remove existing siding, soffits, and fascia; install new 1/2" plywood, house wrap, and James Hardie Board and Batten (or equivalent), primed. Install new porch ceiling, window trim, band board, freeze board, fascia, and soffits Complete exterior painting. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Bristol
Project involves structural rehabilitation of the aeration tanks’ exterior walls. This includes repairing concrete spalls, scaling, cracks, and deterioration, replacing expansion joint materials, adding supplemental reinforcement, and applying a protective coating system to the tanks’ exterior.
Posted Date
Nov 20, 2025
Due Date
Dec 30, 2025
Release: Nov 20, 2025
City of Bristol
Close: Dec 30, 2025
Project involves structural rehabilitation of the aeration tanks’ exterior walls. This includes repairing concrete spalls, scaling, cracks, and deterioration, replacing expansion joint materials, adding supplemental reinforcement, and applying a protective coating system to the tanks’ exterior.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Monroe
Provide house rehabilitation.
Posted Date
Oct 24, 2025
Due Date
Dec 11, 2025
Release: Oct 24, 2025
City of Monroe
Close: Dec 11, 2025
Provide house rehabilitation.
AvailableTioga County
Roof replacements and exterior rehabilitation project. See outside link.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Tioga County
Close: Jan 7, 2026
Roof replacements and exterior rehabilitation project. See outside link.
AvailableMichigan Department of Technology, Management and Budget
Description of work: exterior stabilization and repairs to include structural repairs; roof, gutter, and downspout replacement, salvage and replacement of exterior siding, cladding, and trim; window and door replacement and restoration; and the construction of new front and rear porches.
Posted Date
Jul 15, 2025
Due Date
Dec 3, 2025
Release: Jul 15, 2025
Michigan Department of Technology, Management and Budget
Close: Dec 3, 2025
Description of work: exterior stabilization and repairs to include structural repairs; roof, gutter, and downspout replacement, salvage and replacement of exterior siding, cladding, and trim; window and door replacement and restoration; and the construction of new front and rear porches.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →