Retrieving RFP details
Release
Close
Mill Creek Metropolitan Park District
Park Improvements Construction of Aggregate Parking Lot & Trails.
City of Pleasant Hill
The project consists of replacing an existing aggregate surfaced parking lot with an asphalt surfaced parking lot including grading and pavement striping. Also includes 1 LS of unclassified excavation and existing materials removal/disposal; 130 LF of saw cut and pavement removal (driveway); 2,600 SY of existing gravel parking lot to be removed; see outside link.
Chicago-Gary Regional Airport Authority
Work include passenger boarding bridges and parking lot improvements.
Wisconsin Department of Administration
Work consists of: clearing and grubbing, pulverizing existing asphalt pavement, removing asphaltic surface milling, excavation, base aggregate dense, limestone screenings, asphalt paving, concrete paving and sidewalk, building foundation construction, electrical construction, retaining wall construction, boat launch and dock construction, landscaping, and pavement marking.aBase Bids will be received as a single lump sum bid for: 5) Electrical.
Release
Oct 17, 2025
Close
Oct 31, 2025