Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Colorado Springs
Construction management services for bridge rehabilitation project. Bridge rehabilitation project will replace and extend the top slab of the three-cell box culvert under the road intersection and associated drainage and infrastructure improvements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Niagara County
Work includes rehabilitation of two bridges, includes substructure concrete repairs, bearing replacements, joint replacements, superstructure overcoating, and spot deck repairs. Repairing the bridge top slab, guiderail replacement, filling in scour pockets, reconstructing a portion of the roadway, and sidewalk reconstruction.
Posted Date
Nov 19, 2025
Due Date
Dec 12, 2025
Release: Nov 19, 2025
Niagara County
Close: Dec 12, 2025
Work includes rehabilitation of two bridges, includes substructure concrete repairs, bearing replacements, joint replacements, superstructure overcoating, and spot deck repairs. Repairing the bridge top slab, guiderail replacement, filling in scour pockets, reconstructing a portion of the roadway, and sidewalk reconstruction.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Onondaga County
project include Lakeshore Road Bridge Rehabilitation .
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Onondaga County
Close: Dec 18, 2025
project include Lakeshore Road Bridge Rehabilitation .
AvailableCity of Palm Springs
Work consists of widening the bridge from a 4-lane arterial to a 6-lane arterial, with three lanes in each direction. The project includes seismic retrofitting, installation of new bridge barriers, bridge supports within the channel, and the addition of a 5-foot sidewalk on the north side and a 10-foot-wide multipurpose trail with a physical barrier for bicyclists on the south side. Includes comprehensive construction management services for the Ramon road bridge at whitewater river project. This includes developing project staging and traffic control plans, implementing a quality assurance program (including materials testing and inspection), reviewing construction surveying, ensuring environmental compliance, and conducting public outreach.
Posted Date
Oct 30, 2025
Due Date
Dec 1, 2025
Release: Oct 30, 2025
City of Palm Springs
Close: Dec 1, 2025
Work consists of widening the bridge from a 4-lane arterial to a 6-lane arterial, with three lanes in each direction. The project includes seismic retrofitting, installation of new bridge barriers, bridge supports within the channel, and the addition of a 5-foot sidewalk on the north side and a 10-foot-wide multipurpose trail with a physical barrier for bicyclists on the south side. Includes comprehensive construction management services for the Ramon road bridge at whitewater river project. This includes developing project staging and traffic control plans, implementing a quality assurance program (including materials testing and inspection), reviewing construction surveying, ensuring environmental compliance, and conducting public outreach.
AvailableMcIntosh County
Road and bridge construction materials, equipment, tires and service required.
Posted Date
Nov 20, 2025
Due Date
Dec 9, 2025
Release: Nov 20, 2025
McIntosh County
Close: Dec 9, 2025
Road and bridge construction materials, equipment, tires and service required.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →