Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Adams County
DESIGN-BUILD Services for Fire Suppression and Alarm.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Massachusetts Department of Transportation
Work includes replacement of the existing fire suppression and fire alarm systems.
Posted Date
-
Due Date
Dec 17, 2025
Massachusetts Department of Transportation
Close: Dec 17, 2025
Work includes replacement of the existing fire suppression and fire alarm systems.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Southwest Ohio Regional Transit Authority
The Southwest Ohio Regional Transit Authority (SORTA) seeks architectural and engineering design services to modify the existing wet fire suppression system at the Queensgate Maintenance Garage to a passive mist system covering electric bus storage and maintenance bays. Deliverables include schematic and construction documents, fire alarm and mist system engineering with calculations and specifications, bidding assistance, and construction oversight; proposals will be evaluated on firm experience, qualifications, staff qualifications, and project approach.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Southwest Ohio Regional Transit Authority
Close: Jan 7, 2026
The Southwest Ohio Regional Transit Authority (SORTA) seeks architectural and engineering design services to modify the existing wet fire suppression system at the Queensgate Maintenance Garage to a passive mist system covering electric bus storage and maintenance bays. Deliverables include schematic and construction documents, fire alarm and mist system engineering with calculations and specifications, bidding assistance, and construction oversight; proposals will be evaluated on firm experience, qualifications, staff qualifications, and project approach.
AvailableSan Francisco Department of Public Health
Requesting statements of qualifications (SOQ) from qualified firms to inspect, test, maintain, and repair fire alarm and fire suppression systems. See attached file.
Posted Date
Oct 8, 2025
Due Date
Jan 9, 2026
Release: Oct 8, 2025
San Francisco Department of Public Health
Close: Jan 9, 2026
Requesting statements of qualifications (SOQ) from qualified firms to inspect, test, maintain, and repair fire alarm and fire suppression systems. See attached file.
AvailableNYC Transit Bid Desk
Provide services of a project management consultant to assist in administering, overseeing, and completing on time and within budget the hc9r/qm9r installation of fixed fire suppression system. The Project consists of installing a fixed fire suppression system inside both the HCT and the QMT, along with performing structural repairs to the exhaust air ducts in both tunnels. At HCT, a FFSS prototype system including FFSS buildings, new water supply and electrical feeds, and the in-tunnel piping and valves between stations 18+80 to 46+50, of both the east and west tubes.
Posted Date
Nov 6, 2025
Due Date
Dec 10, 2025
Release: Nov 6, 2025
NYC Transit Bid Desk
Close: Dec 10, 2025
Provide services of a project management consultant to assist in administering, overseeing, and completing on time and within budget the hc9r/qm9r installation of fixed fire suppression system. The Project consists of installing a fixed fire suppression system inside both the HCT and the QMT, along with performing structural repairs to the exhaust air ducts in both tunnels. At HCT, a FFSS prototype system including FFSS buildings, new water supply and electrical feeds, and the in-tunnel piping and valves between stations 18+80 to 46+50, of both the east and west tubes.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →