Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Clarkston Community Schools
Seeking provision and installation of filtered water equipment across multiple district buildings. Work also includes demolition & removal: remove and properly dispose of existing drinking fountains and associated components. Installation: furnish and install new filtered bottle-filling stations (including chilled fountains and faucets) as identified in the attached inventory spreadsheet. Models must meet nsf/ansi 53 for lead reduction and nsf/ansi 42 for particulate removal. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Alma Public School District
Work includes replacement of existing drinking fountains to filter first / healthy hydration compliant bottle filling stations; existing kitchen faucets to compliant filtered kitchen faucets; installation of compliant whole kitchen filtration units.
Posted Date
Nov 10, 2025
Due Date
Nov 25, 2025
Release: Nov 10, 2025
Alma Public School District
Close: Nov 25, 2025
Work includes replacement of existing drinking fountains to filter first / healthy hydration compliant bottle filling stations; existing kitchen faucets to compliant filtered kitchen faucets; installation of compliant whole kitchen filtration units.
AvailableEscanaba Area School District
Replacement of all existing drinking fountains with new filtered drinking fountains with bottle fillers and possible installation of several new filtered drinking fountain locations, including all demolition, plumbing, electrical and associated work.
Posted Date
Nov 12, 2025
Due Date
Dec 3, 2025
Release: Nov 12, 2025
Escanaba Area School District
Close: Dec 3, 2025
Replacement of all existing drinking fountains with new filtered drinking fountains with bottle fillers and possible installation of several new filtered drinking fountain locations, including all demolition, plumbing, electrical and associated work.
AvailableEscanaba Area School District
Work include replacement of all existing drinking fountains with new filtered drinking fountains with bottle fillers and possible installation of several new filtered drinking fountain locations, including all demolition, plumbing, electrical and associated work.
Posted Date
Nov 6, 2025
Due Date
Dec 3, 2025
Release: Nov 6, 2025
Escanaba Area School District
Close: Dec 3, 2025
Work include replacement of all existing drinking fountains with new filtered drinking fountains with bottle fillers and possible installation of several new filtered drinking fountain locations, including all demolition, plumbing, electrical and associated work.
AvailableTown of Carolina Beach
Project consists of the furnishing of all materials, labor and equipment to install a 3rd vertical pressure filter (10') in the existing Alabama Avenue water treatment plant, which includes all piping, valves and a triplex electrical control panel. The project also includes the installation of a raw water well #15, well pump, prefabricated building, interior piping, valves, meter, approximately 1,250 LF of 6" raw water pipe, 8" directional drill, emergency generator and electrical controls.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Town of Carolina Beach
Close: Dec 18, 2025
Project consists of the furnishing of all materials, labor and equipment to install a 3rd vertical pressure filter (10') in the existing Alabama Avenue water treatment plant, which includes all piping, valves and a triplex electrical control panel. The project also includes the installation of a raw water well #15, well pump, prefabricated building, interior piping, valves, meter, approximately 1,250 LF of 6" raw water pipe, 8" directional drill, emergency generator and electrical controls.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis