Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Air Force Materiel Command
Engine Performance Restoration contract in support of the F117 engine. This effort includes sustaining engineering (recurring and nonrecurring), product improvement/modernization, supply chain management, and performance restoration (depot and field support) performed on the F117 engine through the repair of modules, which are each restored based on a light, medium, or heavy level of maintenance and the procurement of new or serviceable life limited parts which have a finite lifespan based on accumulated usage. The engineering support activities include detailed design engineering, maintenance engineering, systems engineering support, technical analyses, drawing and source data maintenance/ updates flight safety analyses, reliability analyses, liaison engineering support, stress analyses, accident investigation, engineering feasibility studies, material deficiency report analysis, field problem investigation, and in-flight emergency response support. The F117 supply chain management effort will require the administion of the supply chain management program. This includes supply chain management logistics, forecasting of parts, long lead-time parts procurement, reparable forecasting, cataloging, obsolescence issues, integration with the Oklahoma City Air Logistics Complex (OC-ALC) for depot/modular level repair/ overhaul support, delivery of serviceable assets to depots and approved repair stations, budget computations, what-if-computations, Time Compliance Technical Order (TCTO) kits supportability, and hosting meetings to support the F117 program office with supply chain management logistics and Government requests for supply chain management data. The F117 overhaul and repair effort will require depot overhaul and field repair services for the F117 propulsion system to ensure a serviceable, ready-to-install engine to meet the required War Readiness Engines (WRE) and serviceable Propulsions System (SPS) levels. Modules will be broken out and planned and programmed each year based upon engine build requirements. LLPs will be separately priced and ordered based upon need. Engine Build Unit (EBU), which is comprised of Quick Engine Change (QEC) kits and modules in the power section, will be the line of tear down inspect, disposition build and test of the F117 engine. The F117 Speedline will be set up for quick repair of stub time engines that require off wing maintenance for return to service.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Naval Supply Systems Command (NAVSUP)
Repair and/or replacement and sustainment for the items identified in Exhibit B for the T700 Engine Components. Under the anticipated contract, the Contractor will be required to stock, warehouse, repair, modify and/or replace, store and provide for shipment of Ready-for-Issue (RFI) condition assets within the established contract performance metrics. Repair replacement, reliability oversight and inventory, configuration and obsolescence management.
Posted Date
Nov 5, 2025
Due Date
Dec 14, 2025
Release: Nov 5, 2025
Naval Supply Systems Command (NAVSUP)
Close: Dec 14, 2025
Repair and/or replacement and sustainment for the items identified in Exhibit B for the T700 Engine Components. Under the anticipated contract, the Contractor will be required to stock, warehouse, repair, modify and/or replace, store and provide for shipment of Ready-for-Issue (RFI) condition assets within the established contract performance metrics. Repair replacement, reliability oversight and inventory, configuration and obsolescence management.
AvailableSuny Tompkins Cortland Community College
Floor restoration.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Suny Tompkins Cortland Community College
Close: Dec 19, 2025
Floor restoration.
AvailablePennsylvania Department of General Services
Ecological Restoration Services.
Posted Date
Jun 10, 2023
Due Date
Jan 27, 2027
Release: Jun 10, 2023
Pennsylvania Department of General Services
Close: Jan 27, 2027
Ecological Restoration Services.
AvailableNJ Division of Property Management & Construction
Coastal wetland restoration project.
Posted Date
Oct 6, 2025
Due Date
Dec 4, 2025
Release: Oct 6, 2025
NJ Division of Property Management & Construction
Close: Dec 4, 2025
Coastal wetland restoration project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis