Retrieving RFP details
Release
Close
Evergreen Metropolitan District
Diverting bear creek and dewatering the work area in accordance with applicable permit requirements. Lockout/tagout of the upstream outlet works gate and accessing the downstream outlet works vault. Excavating the existing channel bottom downstream of the outlet works to expose the existing concrete outfall. Draining and demolishing existing steel pipe, valves, and fittings inside the outlet works vault.
Goose Creek Flood Control District 16
Addition of a new liner coating and repairs within the existing steel outlet works.
City of York
The project will consist of the installation and maintenance of erosion and sedimentation control devices, lowering pond water surface (if necessary), establish a staging area, clearing and grubbing of existing trees, brush and other vegetation as necessary, grade the emergency spillway area, construct the new concrete emergency spillway including side walls, underdrains and dissipater blocks, refurbish the primary spillway by lowering each of the four weirs, replace new drain valves, install new trash rack, raise the crest of the dam, and fine grade, seed, and mat all disturbed areas after construction activities have been completed. Provide the owner with a topographic survey of all new reconstructed areas, maintain reservoir water elevation until "approval to impound" is acquired from the scdhec, and finally remove all equipment and materials from the project site.
City of Greeley
Reservoir outlet gates rehabilitation construction manager-at-risk (project).
Release
Oct 14, 2025
Close
Nov 19, 2025