Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Carter County
Project consists of bridge repair. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Carter County
Carter County Government seeks proposals for immediate rapid services for repairs to Estep Bridge over Doe River. Proposers must demonstrate experience in major road repairs and compliance with FEMA regulations. Evaluation criteria include quality of repair plan, experience, resources, past performance, and price.
Posted Date
-
Due Date
Nov 24, 2025
Carter County
Close: Nov 24, 2025
Carter County Government seeks proposals for immediate rapid services for repairs to Estep Bridge over Doe River. Proposers must demonstrate experience in major road repairs and compliance with FEMA regulations. Evaluation criteria include quality of repair plan, experience, resources, past performance, and price.
AvailableNew Jersey Department of Transportation
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
Posted Date
Dec 2, 2024
Due Date
Jan 8, 2026
Release: Dec 2, 2024
New Jersey Department of Transportation
Close: Jan 8, 2026
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
AvailableCaddo Parish
Construction of a ten-span precast concrete slab span bridge including, but not limited to, earthwork, asphalt concrete pavement, subgrage preparation, class II base course construction, bridge construction, excavation, embankment, and related work.
Posted Date
Sep 13, 2025
Due Date
Nov 18, 2025
Release: Sep 13, 2025
Caddo Parish
Close: Nov 18, 2025
Construction of a ten-span precast concrete slab span bridge including, but not limited to, earthwork, asphalt concrete pavement, subgrage preparation, class II base course construction, bridge construction, excavation, embankment, and related work.
City of Palm Springs
Work consists of widening the bridge from a 4-lane arterial to a 6-lane arterial, with three lanes in each direction. The project includes seismic retrofitting, installation of new bridge barriers, bridge supports within the channel, and the addition of a 5-foot sidewalk on the north side and a 10-foot-wide multipurpose trail with a physical barrier for bicyclists on the south side. Includes comprehensive construction management services for the Ramon road bridge at whitewater river project. This includes developing project staging and traffic control plans, implementing a quality assurance program (including materials testing and inspection), reviewing construction surveying, ensuring environmental compliance, and conducting public outreach.
Posted Date
Oct 30, 2025
Due Date
Dec 1, 2025
Release: Oct 30, 2025
City of Palm Springs
Close: Dec 1, 2025
Work consists of widening the bridge from a 4-lane arterial to a 6-lane arterial, with three lanes in each direction. The project includes seismic retrofitting, installation of new bridge barriers, bridge supports within the channel, and the addition of a 5-foot sidewalk on the north side and a 10-foot-wide multipurpose trail with a physical barrier for bicyclists on the south side. Includes comprehensive construction management services for the Ramon road bridge at whitewater river project. This includes developing project staging and traffic control plans, implementing a quality assurance program (including materials testing and inspection), reviewing construction surveying, ensuring environmental compliance, and conducting public outreach.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis