Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide section 3A paving. 1 LS mobilization, move-in & move-out (including bonds & insurance); 1 AC hydromulch seeding as directed by engineer (turf to be established and maintained, complete in place); 33 EA fine lot grading (including balancing all dirt necessary to achieve lot grading as shown on the approved construction plan set); 1 EA install and remove concrete truck washout; 1 LS maintain existing stabilized construction access and remove; 1 AC row mowing and stripping; 1 LS maintenance of existing erosion control during construction; complete in place; 1 LS as-built topography survey for section 3A inclusive of the top-of-curb, four corners of said lots, the building line points, and grade-break. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Scope of work of the contract documents includes the following: paving FM 361 turn lanes. 1 LS mobilization, move-in & set up, including bonds & insurance; 1 LS traffic control during construction as per detail sheet 25, all inclusive; complete in place; 1 EA install and remove concrete truck washout; 4,850 LF installation of reinforced filter fabric barrier, as per TxDot details and specs, complete in place; 1 LS street cleaning and maintenance of all temporary controls through the contract period; 606 SY remove and dispose of existing asphalt driveway, all inclusive; complete in place; 1,080 SY mill existing asphalt pavement transition at start and end of pavement widening for preparation of 2" overlay as per detail sheet 24. See attached file.
Posted Date
Dec 1, 2025
Due Date
Dec 18, 2025
Release: Dec 1, 2025
Close: Dec 18, 2025
Scope of work of the contract documents includes the following: paving FM 361 turn lanes. 1 LS mobilization, move-in & set up, including bonds & insurance; 1 LS traffic control during construction as per detail sheet 25, all inclusive; complete in place; 1 EA install and remove concrete truck washout; 4,850 LF installation of reinforced filter fabric barrier, as per TxDot details and specs, complete in place; 1 LS street cleaning and maintenance of all temporary controls through the contract period; 606 SY remove and dispose of existing asphalt driveway, all inclusive; complete in place; 1,080 SY mill existing asphalt pavement transition at start and end of pavement widening for preparation of 2" overlay as per detail sheet 24. See attached file.
AvailableMontgomery County MUD 147, through Bleyl Engineering, is soliciting bids for paving, drainage, and utility improvements for Westridge Cove Section 4 in Montgomery County, Texas. A pre-bid meeting is scheduled for December 2, 2025 via Microsoft Teams with call-in audio, and the bid opening indicates participation via Teams and at Bleyl’s Conroe office. Bid proposals are due on January 13, 2026 at 3:00 PM CST.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
Montgomery County MUD 147, through Bleyl Engineering, is soliciting bids for paving, drainage, and utility improvements for Westridge Cove Section 4 in Montgomery County, Texas. A pre-bid meeting is scheduled for December 2, 2025 via Microsoft Teams with call-in audio, and the bid opening indicates participation via Teams and at Bleyl’s Conroe office. Bid proposals are due on January 13, 2026 at 3:00 PM CST.
Fort Bend County Municipal Utility District No. 212 is soliciting sealed bids for construction of Amandera, Section 2 including water lines, sanitary sewer, storm sewer, reinforced concrete paving, and related site restoration. Bids will be received by BGE, Inc. or electronically via Civcast and opened at 2:00 PM local time on December 17, 2025. The project includes significant linear utilities, paving quantities, and requires bonds and compliance with electronic bidding rules.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Fort Bend County Municipal Utility District No. 212 is soliciting sealed bids for construction of Amandera, Section 2 including water lines, sanitary sewer, storm sewer, reinforced concrete paving, and related site restoration. Bids will be received by BGE, Inc. or electronically via Civcast and opened at 2:00 PM local time on December 17, 2025. The project includes significant linear utilities, paving quantities, and requires bonds and compliance with electronic bidding rules.
Paving and Appurtenances.
Posted Date
Jul 10, 2025
Due Date
Dec 11, 2025
Release: Jul 10, 2025
Close: Dec 11, 2025
Paving and Appurtenances.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis