Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Marshall Public School District
Provide internet access service at 9 buildings.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Ysleta Independent School District
Erate 2026 Fiber Upgrade - School Closets.
Posted Date
Nov 5, 2025
Due Date
Dec 4, 2025
Release: Nov 5, 2025
Ysleta Independent School District
Close: Dec 4, 2025
Erate 2026 Fiber Upgrade - School Closets.
AvailableLincoln Park Public Schools
Provide the district with self-provisioned fiber maintenance at fourteen (14) buildings with approx 9 miles of fiber cabling connecting back.
Posted Date
Oct 22, 2025
Due Date
Nov 25, 2025
Release: Oct 22, 2025
Lincoln Park Public Schools
Close: Nov 25, 2025
Provide the district with self-provisioned fiber maintenance at fourteen (14) buildings with approx 9 miles of fiber cabling connecting back.
AvailableGreater Augusta Utility District
Fiber Optic Switch / Cable Installation and Cable Repair. 1.β Install a new 24 strand fiber optic cable through an existing empty 4β diameter, 4,000β long PVC conduit between the wastewater treatment plant and a structure located near Bridge on the rail trail. 2.β Troubleshoot and repair an existing daisy chained fiber optic network located on the Rail Trail between the wastewater treatment plant and Memorial Bridge in Augusta, Maine. The network has failed and needs to be spliced to be repaired.
Posted Date
-
Due Date
Nov 26, 2025
Greater Augusta Utility District
Close: Nov 26, 2025
Fiber Optic Switch / Cable Installation and Cable Repair. 1.β Install a new 24 strand fiber optic cable through an existing empty 4β diameter, 4,000β long PVC conduit between the wastewater treatment plant and a structure located near Bridge on the rail trail. 2.β Troubleshoot and repair an existing daisy chained fiber optic network located on the Rail Trail between the wastewater treatment plant and Memorial Bridge in Augusta, Maine. The network has failed and needs to be spliced to be repaired.
AvailableLincoln Park Public Schools
The general description of the Scope of Work (SOW) for this project is to provide the District with Self-Provisioned Fiber Maintenance at fourteen (14) buildings with approx. 9 miles of fiber cabling connecting back to Park High School.
Posted Date
Oct 28, 2025
Due Date
Nov 25, 2025
Release: Oct 28, 2025
Lincoln Park Public Schools
Close: Nov 25, 2025
The general description of the Scope of Work (SOW) for this project is to provide the District with Self-Provisioned Fiber Maintenance at fourteen (14) buildings with approx. 9 miles of fiber cabling connecting back to Park High School.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis